Development: Sentenced at City of London Magistrates’ Court on 24 November 2026
An Essex steel company has been fined after it supplied falsified safety paperwork for a platform holding up part of a high-pressure gas main.
J.T.L. Steel Fabrications (U.K.) Ltd was prosecuted by the Office for Product Safety and Standards (OPSS), which regulates construction products.
The firm was fined £12,000 at City of London Magistrates’ Court. It was also told to pay £12,048 in costs and a £2,000 victim surcharge.
What happened
The company made a structural steel platform that was installed in Chelmsford. It supports a stepped-down high-pressure gas main and plant.
OPSS found the firm had produced and supplied falsified technical documents for the product. These included:
- a certificate of factory production control
- a declaration of performance
- a declaration of conformity
The court heard the company had not supplied a compliant declaration of performance. That is a legal duty for manufacturers.
The trial took place on 16 November and the company was sentenced on 24 November.
Why the paperwork matters
A declaration of performance tells buyers how a product has been tested and how it performs. Engineers and installers use it to decide whether the product is right for the job.
For structural steel, it links the product to the standard it was made to, and to the factory checks behind it.
If those papers are false, nobody further down the chain can be sure the steel will do what it is supposed to do.
Under regulation 4 of the Construction Products Regulations 2013, it is an offence to supply a product covered by a designated standard without the right declaration and marking.
What the minister said
Baroness Blake, the minister for building safety, said people should be able to trust that the materials in buildings are safe and legal.
“There can be no shortcuts when it comes to building safety,” she said.
What it means for trades
The case comes as the government widens the safety regime for building products after the Grenfell Tower fire.
For anyone buying or fitting structural products, it is a reminder to ask for the declaration of performance and check it matches what turns up on site.
If a document looks wrong, or the supplier cannot provide one, the product should not be installed until it is sorted out.
Sources · OPSS press release · Construction News · Construction Enquirer
Illustrative photograph; it does not show the company named. Photograph by Desmond Charles Mushi on Unsplash.
Share article
Was this article helpful?
Thanks — that helps us improve these guides.



