Renewables calculatorsAll tradesElectricalHigh-voltageGas and plumbingBricklayingCarpentryRoofingTilingPlasteringPainting and decoratingInsulation and retrofitConcrete and groundworksScaffolding and liftingSteelworkWelding and fabrication Renewables calculators.Heat pumps, solar PV, batteries, solar thermal and EV-ready energy maths. AllHeat lossHeat pump selectionEmittersHydraulicsEnergy and running costsPlanning and grantsHot waterYield and sizingString designDC cablingInverter and grid connectionSelf-consumption and paybackBatteriesSolar thermalEV chargingCarbon Heat lossHeat lossRoom design heat loss (fabric U·A·ΔT plus ventilation 0.33·n·V·ΔT)ΔT=Ti−TeHeat lossWhole-house design heat loss and W/m²P=P1+P2+P3+P4+P5+P6+P7+P8Heat lossIndicative heat loss from EPC heating demand (MCS 031 method)Ps=1000Q24DHeat pump selectionHeat pump selectionHeat pump capacity check against design heat loss (MIS 3005-D)Preq=Pd(1+m100)EmittersEmittersRadiator output at heat pump flow temperatures (ΔT correction)ΔT=Tf+Tr2−TiEmittersRequired radiator size (ΔT 50 rating) and oversize factor for a heat pumpΔT=Tf+Tr2−TiHydraulicsHydraulicsPrimary flow rate from heat output and temperature difference (Q = ṁ·cp·ΔT)m˙=PcpΔTHydraulicsPipe velocity check and heat-carrying capacityA=π(d/1000)24HydraulicsMinimum system volume and buffer or volumiser sizeVreq=max(Vm,rP)Energy and running costsEnergy and running costsAnnual heat demand from design heat loss and degree daysH=PdTi−TeEnergy and running costsAnnual running cost: heat pump compared with a gas boilerEhp=QSEnergy and running costsAnnual carbon saving: heat pump compared with a gas boilerGhp=QSfePlanning and grantsPlanning and grantsHeat pump sound level at the assessment position (MCS 020 method)Lp=Lw+10log10(Q4πr2)−BPlanning and grantsBoiler Upgrade Scheme grant and customer contribution (England and Wales, from 21 July 2026)Cc=max(0,C−G)Hot waterHot waterHot water cylinder reheat timeE=Vρcp(T2−T1)3600Yield and sizingYield and sizingPV annual yield estimate (MCS method)E=PpkKkSFYield and sizingArray size from panel countPpk=NWp1000Yield and sizingNumber of panels that fit a roof (portrait)nc=⌊1000Wr−2e+sB+s⌋Yield and sizingTilt and orientation loss (Kk comparison)Lp=100(1−KaKo)String designString designCold open-circuit string voltage and maximum modules per stringVc=Voc(1+βV100(Tmin−25))String designMinimum modules per string (hot Vmp vs MPPT minimum)Tc=Ta+(NOCT−20)G800DC cablingDC cablingString design current and DC cable rating check (1.25 × Isc)Ib=1.25IscNpDC cablingDC string cable voltage dropRt=R20(1+0.00393(θ−20))Inverter and grid connectionInverter and grid connectionInverter sizing ratio (DC/AC)R=PdcPacInverter and grid connectionG98 limit check (16 A per phase)P=Ppv+PbSelf-consumption and paybackSelf-consumption and paybackSelf-consumption and export estimateEsc=Ef100Self-consumption and paybackSimple payback from bill savings and SEG exportSsc=Ef100pi100BatteriesBatteriesBattery usable capacityEu=CnDoD100BatteriesBattery autonomy (hours of supply)t=Eu(1−r/100)PSolar thermalSolar thermalSolar thermal collector output (ISO 9806 / EN 12975 efficiency curve)ΔT=Tm−TaEV chargingEV chargingEV charging time from charger power and efficiencyEb=Cb(S2−S1)100CarbonCarbonCO₂e saving from solar generation (UK grid factor)M=E×EF