Planned maintenance. A checklist for every visit.
Pick the equipment, choose the visit type, then tick tasks off as you go. Add notes, readings and your own tasks, and share or print the finished sheet.
Wall, ceiling, cassette or ducted split and multi-split systems.
Visit type
Shows the tasks due at this visit. An annual visit includes everything.
Job details
Checklist tasks
Before you start 0 / 4
Indoor unit 0 / 8
Outdoor unit 0 / 7
Electrical and controls 0 / 4
Performance check 0 / 5
Add a task
Custom tasks are saved with this checklist on this device.
Your ticks and notes are saved in this browser only, on this device. Nothing is sent to Tradefox. Clearing your browser data removes them, so share or print a copy for your records.
More checklist templates
The full task list for each of the other templates. Choose a template above to tick it off, add notes and share or print it.
Air source heat pump 25 tasks
Monobloc or split air-to-water heat pumps for heating and hot water.
Before you start
- Read the controller error and alarm history; record any faults (annually)
- Isolate the outdoor unit and controls; prove dead before opening covers (annually)
- Check the F-gas or refrigerant label is present; record whether leak checks apply (annually)
Outdoor unit
- Clear leaves and debris from the coil, fan outlet and base; check airflow clearances (every 6 months)
- Clean the evaporator coil gently; straighten damaged fins (annually)
- Check the defrost drain and condensate path are clear and will not freeze or flood paths (annually)
- Check the fan, guard, mounting feet, anti-vibration pads and base for security (annually)
- Check flexible hoses or pipe connections to the unit for leaks and perishing (annually)
- Inspect pipe insulation outside the building; replace damaged or missing sections (annually)
Hydraulics
- Check and record system pressure cold; top up and find the cause if it has dropped (annually)
- Check expansion vessel pre-charge with the system side depressurised (annually)
- Clean the strainer or magnetic filter; note how much debris was collected (annually)
- Test inhibitor concentration or antifreeze (glycol) strength and record the reading (annually)
- Check frost protection valves and anti-freeze devices where fitted (annually)
- Record flow and return temperatures and flow rate under load; compare with commissioning (annually)
- Bleed air from high points and check automatic air vents are not weeping (annually)
Hot water cylinder
- Manually operate the temperature and pressure relief valve and check the tundish and discharge (annually)
- Check the unvented cylinder expansion vessel or air gap to the manufacturer’s procedure (annually)
- Confirm the legionella (pasteurisation) cycle is set and has run, and the immersion heater works (annually)
- Check stored hot water temperature at the cylinder and the furthest outlet (annually)
Controls and electrical
- Check terminations, contactors and isolators for tightness and heat damage (annually)
- Check weather compensation curve, schedules and set points match the agreed settings (annually)
- Check the outdoor air sensor is shaded, secure and reading sensibly (annually)
- Update controller software if the manufacturer recommends it (annually)
- Run the system and confirm heating and hot water operate; explain any changes to the customer (annually)
Air handling unit 26 tasks
Packaged or built-up AHUs with filters, coils, fans and optional heat recovery.
Before you start
- Agree shutdown with the site or BMS operator; isolate and lock off at the local isolator (monthly)
- Wait for fans to stop fully before opening access doors (monthly)
Filters
- Record filter differential pressure on each bank against the clean and final values (monthly)
- Replace filters at the final pressure drop or the scheduled interval, whichever is first (every 3 months)
- Check filter frames and seals for bypass gaps; bag the old filters before removal (every 3 months)
- Check pressure gauge or sensor tubing is connected and reading (every 6 months)
Fans and drives
- Check belt tension and alignment; replace worn or cracked belts as a set (every 3 months)
- Listen for bearing noise and check for vibration; record motor current (every 3 months)
- Lubricate bearings where not sealed for life, to the manufacturer’s schedule (every 6 months)
- Clean fan impellers and check balance weights and fixings (every 6 months)
- Check anti-vibration mounts and flexible connections for splits (annually)
Coils and drain trays
- Clean and check condensate drain trays slope to the outlet and do not hold water (every 3 months)
- Check traps on the condensate drain are primed and the correct depth for the fan pressure (every 3 months)
- Inspect heating and cooling coil faces; clean when fouled (every 6 months)
- Test frost protection (frost thermostat or sensor) trips heating to full and stops the fan as designed (every 6 months)
- Check coil valves and actuators stroke fully open and closed (annually)
Heat recovery and dampers
- Check thermal wheel drive, seals and purge sector; or plate heat exchanger for fouling (every 6 months)
- Check fresh air, exhaust and recirculation dampers move through full travel (every 6 months)
- Check damper linkages are tight and actuators match BMS position (annually)
Humidifier (if fitted)
- Inspect for scale, slime or standing water; clean and disinfect as the water risk assessment requires (monthly)
- Check steam cylinders or nozzles, drains and controls; replace consumables (every 6 months)
Casing, controls and performance
- Check access door seals and latches; no air leaks or water ingress (every 6 months)
- Check BMS sensors against a calibrated reference: temperature, humidity, pressure (annually)
- Measure and record airflow or fan speed against the design or commissioning figures (annually)
- Check electrical terminations, VSDs and panel cooling fans with power isolated where required (annually)
- Restore the unit, confirm normal running on the BMS and record the visit (monthly)
Boiler room (commercial heating) 21 tasks
Plant room checks around gas-fired boilers, pumps and pressurisation. Combustion work needs Gas Safe registration for the appliance type.
Plant room
- Check the plant room is clear of stored materials and combustibles; access is unobstructed (monthly)
- Check permanent ventilation openings are open and not blocked (monthly)
- Check lighting and emergency lighting work (every 3 months)
- Check the schematic, emergency procedures and isolation points are displayed and current (annually)
Gas safety
- Check the gas detection system is in service and no alarms are active (every 3 months)
- Test the emergency gas shut-off valve or interlock operates (by a competent gas engineer) (annually)
- Arrange gas tightness test and appliance service by a Gas Safe registered engineer (annually)
Boilers
- Check each boiler for fault lockouts, leaks, and unusual noise or smell (monthly)
- Record combustion analysis readings from the service engineer’s report (annually)
- Inspect flue and chimney route, terminals and supports for damage and leaks (annually)
- Check condensate drains and neutraliser; replace neutraliser media as needed (every 6 months)
Pumps and pipework
- Check pumps for leaks, noise and overheating; confirm duty/standby changeover works (monthly)
- Check strainers and dirt separators; clean if the pressure drop has increased (every 3 months)
- Check insulation, labels and flow direction arrows on pipework (every 6 months)
- Exercise isolating valves through full travel (annually)
Pressurisation and water treatment
- Record system pressure; check the pressurisation unit is not short cycling (monthly)
- Check expansion vessel pre-charge (every 6 months)
- Take a system water sample or test inhibitor level; record the result (every 3 months)
- Manually check safety valves discharge freely and reseat (where safe to do so) (annually)
Records
- Record readings and defects in the plant room log book (monthly)
- Confirm gas safety and service records are on file (annually)
Refrigeration cold room 20 tasks
Walk-in chiller or freezer room with remote or packaged condensing unit.
Room and doors
- Check door seals for splits and gaps; check door closer and hinges (monthly)
- Test the person-trapped alarm and inside door release (monthly)
- Check door frame or perimeter heaters on freezer rooms (every 3 months)
- Check panels, joints and floor for damage, ice build-up or water (every 3 months)
- Check lighting and guards inside the room (every 3 months)
Evaporator
- Check the evaporator coil is clear of ice after defrost; clean if dirty (every 3 months)
- Watch a defrost cycle: heaters or hot gas work and terminate correctly (every 3 months)
- Check the drain tray and drain line are clear; drain line heater works on freezer rooms (every 3 months)
- Check evaporator fans run, rotate the right way and blades are not iced or damaged (every 6 months)
Condensing unit
- Clean the condenser coil and clear debris around the unit (every 3 months)
- Check fan motors, guards and mountings (every 6 months)
- Check the sight glass for flash gas and the moisture indicator colour (every 6 months)
- Inspect pipework, joints and capillaries for oil staining, rubbing and vibration (annually)
- Check compressor oil level where a sight glass is fitted (annually)
- Record compressor current against the nameplate (annually)
Controls and records
- Check room temperature against a calibrated thermometer; adjust the probe offset if needed (every 3 months)
- Check the high temperature alarm works and alerts the right people (every 3 months)
- F-gas certified engineers: carry out the required leak check and record it in the log (annually)
- With power isolated, check electrical terminations and contactors for heat damage (annually)
- Review the site temperature records for drift or alarms since the last visit (monthly)
Ventilation and MVHR 14 tasks
Mechanical ventilation with heat recovery and whole-house extract systems.
Unit
- Clean or replace supply and extract filters; reset the filter timer (every 3 months)
- Clean the heat exchanger core to the manufacturer’s method (annually)
- Check the condensate drain and trap are clear and primed; no leaks (annually)
- Clean fans and check they run quietly without vibration (annually)
- Check the summer bypass opens and closes (annually)
- Check frost protection settings and operation (annually)
- Check electrical connections and the local isolator (annually)
Ductwork and terminals
- Check ducts in cold spaces are insulated and not crushed or disconnected (annually)
- Check room terminals are clean and have not been readjusted (annually)
- Check external supply and exhaust terminals are clear of nests, leaves and blockage (annually)
- Measure flow rates at terminals on trickle and boost; compare with commissioning figures (annually)
Controls
- Test boost switches, humidistats and timers (annually)
- Check the control panel for faults or filter warnings (annually)
- Explain filter changes and boost use to the occupier and leave records (annually)
Related: look up fault codes with the HVAC error code finder, work through faults with the troubleshooting guide, find documentation in the appliance manuals finder, and check leak-test intervals with the F-gas leak check frequency calculator. Build your skills with Tradefox training courses.
About these checklists. The tasks are general good practice written by Tradefox for training. Intervals are typical starting points in the style used by industry maintenance schedules such as SFG20; they are not taken from any published schedule. The equipment manufacturer’s instructions, statutory requirements and your client’s agreed maintenance regime come first.
Always isolate and lock off before working on equipment, prove dead, and follow your company’s safe systems of work and risk assessments. Refrigerant handling and leak checks need F-gas certification. Gas work needs Gas Safe registration for the appliance type.