- where
- generation used on site (kWh/yr)
- annual generation (kWh/yr)
- self-consumption fraction (%)
- generation exported (kWh/yr)
- share of demand met by solar (%)
- annual electricity demand (kWh/yr)
Explain this equation
Splits annual solar generation into what the home uses directly and what is exported, and shows how much of the home's demand solar covers.
The self-consumption fraction f is the share of generation used in the home at the time it is produced, taken from the MCS self-consumption tables for the occupancy and demand. Applying it to the generation gives the energy used on site; the rest is exported. Dividing the on-site use by the home's annual demand gives the share of demand met.
Straight percentage splits of the generation figure.
Sense check: 3,500 kWh at 40% is 1,400 kWh used and 2,100 kWh exported, covering about 47% of a 3,000 kWh demand.
Watch out: a battery, hot water diverter or daytime occupancy raises f considerably. Use the table for the actual arrangement.
Splits annual PV generation into what the home uses directly and what is exported, from a self-consumption percentage.
Enter your values to see the result.
Good to know
Take the percentage from the MCS MGD 003 look-up tables, which depend on annual demand, generation, occupancy archetype (home all day, half day or out all day) and any battery. MGD 003 caps self-consumption at 95%, and only counts a battery that meets its efficiency and charge-rate conditions (such as at least 80% round-trip efficiency).
Common mistake
Assuming all generation is used in the home; without a battery a typical household uses well under half of a 4 kWp system's output.
Limits
Annual totals only. The fraction is an estimate from typical profiles, not a measured figure. Diverters, EVs and heat pumps change it.