First fix carpentry is the stage where a building goes from a bare shell to something ready for the plasterer. It’s the timber work that ends up hidden: the studs, joists, roof and linings that everything else hangs off. Get it tight and square and the trades that follow have an easy run. Get the order wrong, or leave a job half done, and the problems often don’t show until the plaster’s on, when they’re far harder to put right. The scope is well defined. The sequencing is where sites come unstuck.
What First Fix Carpentry Covers
Everything structural and hidden goes in during this stage, before the walls and ceilings are boarded and skimmed. Plastering is the line that splits first fix from second fix, so anything that needs to sit behind the finish has to be done now. The main items are:
- Floor Structure: Joists, joist hangers and the first-floor decking.
- Stud Partitions: Timber studwork with noggins to form the room layout.
- Roof Carpentry: Trusses or a cut roof, along with the wall plates.
- Door Linings and Frames: Internal linings and external or garage frames set into their openings.
- Staircase Carcass: Strings, treads, risers and newel posts, with the handrail and spindles usually left for second fix.
- Grounds, Boxing and Traps: Fixing grounds, pipe boxing and loft hatches.
Window boards sit on the fence. Some carpenters fit them at first fix, others leave them until after plastering, so agree it on site rather than assuming. The same goes for fascias and soffits, which may fall to the carpenter depending on the job.
How First Fix Fits the Build Sequence
First fix work doesn’t happen in isolation. It runs alongside the first fix electricians and plumbers, and the order those trades go in decides how smoothly the job runs. The rough order is:
- Frame and Deck: Studs, joists and roof structure go up first.
- First Fix Services: Electricians and plumbers run cables and pipework through the carcass.
- Noggins and Pattresses: The carpenter adds timber wherever fixings will land later.
- Insulation and Fire-Stopping: Fitted before anything is closed up.
- Boarding and Plaster: Only once the work behind has been checked and signed off.
The carpenter and the services trades share the same stud and joist runs, so they have to talk. Pipework and cables need routes through the timber, and those routes have rules, which is where a lot of damage gets done.
Where Sequencing Goes Wrong
Most first fix failures aren’t caused by bad carpentry. They come down to bad timing and poor coordination. These are the most common:
Boarding Before Services Are In
The boards go up and get skimmed, then the electrician realises a cable run was missed. Now it’s a case of cutting into fresh plasterboard or taking down a ceiling. Nothing should be closed up until every service is run, checked and signed off.
No Noggins Left for Fixings
Radiators, wall units, TVs, grab rails and sanitaryware all need solid timber behind the board to fix to. Miss the noggins at first fix and there’s nothing to screw into once the wall’s skimmed. Mark up every fixing point before the studwork is boarded.
Door Linings Set to the Wrong Floor Level
Linings fixed before the finished floor build-up is known end up at the wrong height. The door then catches on the floor finish, or leaves a gap too big to trim out. Set linings to the finished floor level, not the bare deck.
Studs Out of Plumb and Square
Studwork that’s out of plumb shows up as soon as skirting and architrave go on at second fix, leaving wedge-shaped gaps that filler won’t hide well. Check every stud with a level and every opening for square as you build, not afterwards.
Building In Damp or Unseasoned Timber
Timber fixed while it’s wet, or above a suitable moisture content for its location, shrinks once the heating comes on. That leads to nail pops, cracked plaster and creaking floors. Use kiln-dried timber, keep it dry and covered until the structure is weathertight, and give it time to acclimatise to the building before fixing.
The Regulations That Shape First Fix
Several parts of the Building Regulations apply directly to first fix work, and building control may want to inspect it before it’s covered up. The Approved Documents below apply in England. Wales has its own Approved Documents, Scotland works to the Building Standards Technical Handbooks, and Northern Ireland to its Technical Booklets. The principles are similar across all four:
- Structure, Approved Document A: The widely used guidance for simply supported solid timber floor joists (as given in TRADA span tables and NHBC Standards) is that notches go in the top edge, no deeper than one-eighth of the joist depth, and between 0.07 and 0.25 of the span from the support. Holes go on the centreline, no larger than a quarter of the joist depth, between 0.25 and 0.4 of the span from the support, and at least three diameters apart.
- Engineered Joists: I-joists should only be drilled where the manufacturer’s hole chart allows, normally in the web and never through the flanges. Metal-web joists must not be cut at all, whether the timber flanges or the steel webs, so route services through the open webs instead.
- Fire, Approved Document B: Fire-stopping and cavity barriers must be provided in concealed spaces, including those in timber frames and at compartment walls and floors, so fire and smoke can’t spread through hidden voids.
- Sound, Approved Document E: Separating walls and floors between homes need the correct build-up to meet the sound insulation standards, and careless penetrations can undermine it.
- Site Coordination, CDM 2015: On projects with more than one contractor, the principal contractor plans, manages and coordinates the construction phase, including how trades are sequenced, under the Construction (Design and Management) Regulations 2015.
Roof carpentry and upper-floor work also involve working at height, so safe access planned under the Work at Height Regulations 2005 needs to be in place before anyone goes up.
Getting First Fix Right Before the Plasterer Arrives
A quick walk-round before the boards go up catches most of what would otherwise become a second fix headache. Run through the basics:
- Check Plumb and Square: Spirit level on every stud wall, and every door opening checked for square.
- Level the Floor: Run a long straight edge across the joists to show any dip or crown before the decking hides it.
- Confirm Fixings: Every noggin and pattress in place for whatever will be fixed to the wall later.
- Sign Off Services: Cables and pipes run, and first fix pipework pressure tested, before anything is closed up.
- Check the Timber Is Dry: No damp or green timber built into a structure that’s about to be heated.
Sort these out while the structure is open and easy to reach. Once the plaster’s on, every one of them turns into a strip-out. First fix carpentry rewards the carpenter who thinks two trades ahead, and catches out the one who only thinks about the timber in front of them.
Ready to keep improving your carpentry skills? Explore Tradefox’s interactive training, practise with guided simulations and work through each activity at your own pace, wherever you have time to learn.
Calculators for this job
Free Tradefox calculators that go with this guide:
- Stud and joist centre spacing – Set out studs or joists at 400 or 600mm centres.
- Noggins between members – Cut lengths for noggins between studs or joists.
- Timber stud partition materials – Studs, plates and noggings for a whole partition.