Development: Plans reported 26 November 2026
Revised plans have been submitted for the final building in a major regeneration scheme next to Maidenhead railway station.
Developer HUB and Norwegian investor Smedvig have lodged plans for Arven, an eight-storey office building of about 70,000 sq ft. It would complete the One Maidenhead masterplan, previously known as The Landing.
The scheme
- The 3.5-acre site lies between King Street, Queen Street and Broadway, linking the Elizabeth line station with the town centre.
- The first phase, finished in 2024 by JJ Rhatigan, includes 429 rental homes.
- Glencar is building the neighbouring Trehus office scheme, due to finish in spring 2027.
The new building
Arven has been designed by Waugh Thistleton Architects. It would have a red brick façade, two roof terraces, and shops and a café on the ground floor. It is targeting a BREEAM Excellent rating.
No contractor or start date has been announced.
What it means for trades
If approved, the building would bring work for brickwork, cladding, mechanical and electrical, drylining and fit-out contractors in the Thames Valley. Brick-faced commercial schemes are welcome news for bricklayers at a time when housebuilding, the trade’s main source of work, has slowed.
Sources · Construction Enquirer
Main image: yellow crane next to a building under construction. Photo by Frames For Your Heart on Unsplash.
Share article
Was this article helpful?
Thanks — that helps us improve these guides.



