What the numbers mean on site
Bricklaying, rendering and screeds
NHBC Standards say brickwork and blockwork should not be built when the air temperature is below 3°C and falling. The Mortar Industry Association says masonry construction should stop below 3°C unless the mortar is held at a minimum of 4°C until it has hardened, for example in a heated enclosure. Freshly laid mortar can fail if it freezes, so cover materials and new work.
Roofing, scaffolding and work at height
There is no single legal wind limit for work at height: it depends on the equipment, and gusts matter more than averages. NHBC advises setting your own wind and gust limits for scaffolds and roofs, stopping when they are exceeded, and checking conditions with an anemometer at the workplace rather than relying on a forecast alone. For roof work, HSE guidance HSG33 covers wind speeds. Cranes have a manufacturer maximum design wind speed and must be taken out of service above it.
Painting, decorating and external coatings
Rain and damp hold moisture in substrates and extend drying and curing times. Minimum application temperatures and humidity limits vary by product, so check the manufacturer data sheet for what you are using rather than a general rule.
Groundworks and concrete
Frost affects pours, screeds and curing. Protect fresh work overnight, and allow for wet ground slowing excavation and site access.
This page reports forecast conditions and the published thresholds that go with them. It is not a risk assessment and does not say whether work is safe. There is no legal minimum or maximum temperature for working outdoors; the decision stays with the duty holder under your own RAMS.