Free toolbox talk 01 · Electrical
Correct isolation toolbox talk
Seven steps for correct electrical isolation. A free, ready-to-run briefing for UK sites.
Why this matters
HSE warns of accidents on equipment assumed dead but still live, and live work without adequate precautions. Installations may have multiple sources: mains, PV, batteries and bidirectional EV systems. A PEN fault can put dangerous current on earth or bonding even with the main switch off.
Key points
- Step 1, permission and planning: get permission, identify every supply, complete your risk assessment, check if a permit is needed.
- Step 2: check for danger before touching equipment. Competent people assess supply faults, including diverted neutral current, where relevant.
- Step 3: isolate the circuit from ALL sources: mains, PV, batteries, UPS, generators and any vehicle-to-building supply. Do not rely on an off button.
- Step 4: use suitable isolating devices, lock off and label each source. Secure against reconnection and make stored energy safe.
- Step 5: check a suitable two-pole voltage detector, then prove it works on a proving unit or suitable known live source before testing.
- Step 6: prove dead at the point of work: test all relevant conductor combinations, including line-to-line, line-to-neutral and line-to-earth.
- Step 7: re-prove your indicator on the same source. If it fails, the test can't be trusted. Start again.
- Throughout: use your own lock, keep the key on you, and never trust labels or an 'off' light.
Do and don’t
✓Do
- Use a suitable two-pole detector meeting GS38 guidance. Additional fuses are not required for every detector.
- Only competent people assess earth or bonding current. A low reading does not prove there is no PEN fault.
- Lock off each source with a safety padlock and notice. Use a hasp for group isolations.
- Photograph your isolations so there is a record.
- Report suspected supply-side faults to the DNO on 105 and keep a log.
✗Don’t
- Don't use a multifunction tester, multimeter or non-contact 'volt stick' to prove dead.
- Don’t trust an inverter or charger’s off state. Isolate ALL feeds using its safe shutdown procedure and prove dead.
- Don't touch or disconnect bonding conductors that may be carrying current.
- Don't skip re-proving your indicator, even if you're in a hurry.
- Don't do electrical work you are not trained and authorised to do.
Ask the group
- What other sources of supply could be on the jobs we're doing now?
- Who has a clamp meter, and when did we last clamp the main earth?
- What would you do if you found current on the earth before starting?
- How do we make sure nobody switches back on while someone is still working?
If it goes wrong
Do not touch a casualty or suspect metalwork until every source is made safe. Call 999 and get a first aider. Stop if danger is found; only competent, authorised people may investigate. Report supply faults on 105 in Great Britain.
Quick check
Five questions to check the talk landed. Ask them out loud, then show the answers.
1. What is step 1 of correct isolation?
- Switch off the main switch
- Get permission, identify every supply and plan the work
- Test the circuit dead
Answer: Get permission, identify every supply and plan the work. Plan the work, obtain authority and identify all sources before isolation. Follow the site safe system of work.
2. Which instrument should be used to prove dead?
- A GS38 two-pole voltage indicator
- A GS38 two-pole voltage indicator
- A non-contact detector
Answer: A GS38 two-pole voltage indicator. HSE recommends a suitable voltage detector. Non-contact indicators cannot prove dead; a proving unit checks the detector.
3. Why do you clamp the main earth before starting?
- To check for current on the earth from a fault
- To measure the voltage
- It isn't needed
Answer: To check for current on the earth from a fault. Earth or bonding current can indicate danger. No clamp reading proves a PEN fault absent; stop and escalate concerns to a competent person.
4. You find a supply-side fault. Who do you call?
- Nobody, just carry on
- The DNO on 105
- The customer's energy supplier
Answer: The DNO on 105. Report supply-side faults to the network operator: 105 in Great Britain. In Northern Ireland, use NIE Networks emergency contact.
5. Your indicator won't prove live after testing. What now?
- Trust the dead result
- Stop, take the indicator out of use and start the isolation again
- Try a different socket
Answer: Stop, take the indicator out of use and start the isolation again. If the indicator fails the re-prove, the test results can't be trusted. Stop and restart the isolation.
Running this talk on site?The PDF has a sign-in sheet for your safety file and a poster for the welfare cabin.
Download free PDFGo further
Sources and qualifications
Source review: 25 November 2026. GB legislation unless another nation is identified. Environmental record periods are for England; check the rules for the site location.
A4-related review: suitable isolation devices (Table 537.4) and multiple supplies, including PV, batteries and vehicle-to-building supply. The safe-work sequence is based on HSG85/GS38, not a PENfault campaign threshold. No 15 mA pass/fail limit is asserted.
A4 basis: published IET guidance; the full licensed standard was not available for clause-by-clause checking. This is a source review, not installation certification. IET current edition.
- HSE HSG85: Electricity at work – safe working practices
Talk sheet steps 1-7; all-source isolation, stored energy, lock-off, proving dead, competence and emergency precautions (paras 48-55). - HSE GS38: Electrical test equipment
Detector choice, proving before/after use, non-contact limitations and fuse qualification (paras 12-13, 19-20); quiz 2 and 5. - IET: Protective, isolation and switching devices explained (2026)
A4 context: Table 537.4, suitable isolating devices and distinction between switching off and isolation. - IET: Broken PEN
PEN fault and diverted neutral current hazards; main switch off or one low clamp reading does not establish safety; quiz 3. - Electricity at Work Regulations 1989, regulation 13
Legal precautions against equipment becoming electrically charged while work is carried out.
More toolbox talks
This talk supports, but does not replace, your site-specific risk assessment, method statement, training and supervision. Free to download, print and share.