Air source heat pumps explained: how they work, installation basics and the Boiler Upgrade Scheme

Air source heat pump unit in the garden beside a brick house

Air source heat pumps (ASHPs) are now a routine job for UK heating engineers, and more electricians, plumbers and apprentices are being asked to work on them. This guide covers how they work, what good design looks like, the rules on where they can go, the electrical and refrigerant points to watch, and how the Boiler Upgrade Scheme (BUS) grant works for your customers.

How an air source heat pump works

A heat pump moves heat rather than making it. The outdoor unit draws in outside air over an evaporator coil. A refrigerant inside the coil boils at a very low temperature, so it absorbs heat even from cold winter air. A compressor raises the pressure and temperature of that refrigerant vapour, and a heat exchanger (the condenser) passes the heat into the home’s heating water. The refrigerant then goes through an expansion valve, cools down, and the cycle starts again.

Because most of the energy comes from the outside air, a well-designed system delivers several units of heat for every unit of electricity it uses. That ratio is the coefficient of performance (COP). The figure that matters across a whole year is the seasonal coefficient of performance (SCOP). SCOP is highest when the system runs at a low flow temperature, which is why design matters so much.

  • Air-to-water heat pumps heat water for radiators, underfloor heating and the hot water cylinder. This is the common type in UK homes.
  • Air-to-air heat pumps blow warm air into rooms, like a reversible air conditioner. They don’t provide hot water.
  • Monobloc units keep the whole refrigerant circuit sealed inside the outdoor unit, with water pipes running into the house. Split systems run refrigerant pipework between an outdoor and an indoor unit.

Design and sizing: start with heat loss

Most poor heat pump jobs fail at the design stage, not the installation. A gas boiler can mask an oversized or badly balanced system; a heat pump cannot.

  • Do a room-by-room heat loss calculation. MCS installations follow the MCS heat pump design standard (MIS 3005-D), which requires a proper heat loss calculation, not a rule of thumb based on the old boiler’s size.
  • Choose a design flow temperature. The lower the flow temperature, the better the efficiency. That usually means checking every radiator against the room’s heat loss at that temperature, and upsizing emitters where needed.
  • Size the heat pump to the heat loss. An oversized unit cycles on and off and runs less efficiently. An undersized one leaves rooms cold on the coldest days.
  • Check the pipework. Heat pumps run at lower temperature differences and higher flow rates than boilers, so narrow microbore runs can restrict flow.
  • Plan the hot water. You’ll normally need a heat pump-compatible cylinder with a large coil, plus a plan for legionella protection.

Where the unit can go: planning basics

In England, most domestic ASHPs can be installed under permitted development, without a planning application. The rules were relaxed from 29 May 2025:

  • The old rule that kept units at least 1 metre from the property boundary has been removed (the 1 metre limit from the edge of a flat roof still applies).
  • Detached houses can have up to two units.
  • The maximum size of the outdoor unit on a house has increased to 1.5 cubic metres (0.6 cubic metres on flats).
  • The installation must still pass the MCS 020(a) sound calculation: the predicted level must not exceed 37 dB(A), assessed 1 metre in front of the nearest neighbour’s habitable-room window or door.

Listed buildings, conservation areas, flats and other special cases have extra conditions. Scotland, Wales and Northern Ireland have their own rules. If in doubt, check with the local planning authority before you fit anything.

On site, think about airflow around the unit, condensate and defrost water (it needs somewhere to drain without icing a path), vibration isolation, access for servicing, and the manufacturer’s minimum clearances.

Electrical supply and the DNO

A heat pump is a significant new electrical load, so the electrical side needs the same care as the plumbing.

  • Tell the network operator. The distribution network operator (DNO) must be told about every heat pump installation. If the property’s new maximum demand stays below 60A and the other criteria are met, you can connect first and notify the DNO within 28 days (“connect and notify”). If the new maximum demand is 60A to 100A, apply before installing; the DNO should respond within 10 working days.
  • Find the right DNO using the Energy Networks Association’s postcode tool, or the first two digits of the MPAN on the electricity bill.
  • Design the circuit to BS 7671. That means a dedicated circuit, correct protective devices, isolation at the unit, suitable cable for outdoor runs, and an assessment of the supply and earthing arrangement. Pay particular attention to outdoor equipment on a TN-C-S (PME) supply.
  • Check maximum demand for the whole installation, especially where an EV charger, electric shower or battery is already fitted.

Refrigerants and F-gas

Who can do which job depends on the type of unit and the refrigerant inside it.

  • Monobloc units arrive with the refrigerant circuit sealed, so installing one doesn’t normally require F-gas certification. Anyone who works on the refrigerant components later does need it.
  • Split systems need an F-gas certified engineer to make and test the refrigerant pipework connections.
  • R290 (propane) units are increasingly common. R290 is not a fluorinated gas, but it is highly flammable. Manufacturers define a safety zone around the outdoor unit, which must stay clear of ignition sources, windows, doors, vents, drains and dips in the ground where gas could collect. Follow the manufacturer’s instructions exactly and carry out your own site risk assessment. The Heat Pump Association backs specific training for flammable refrigerants.

The Boiler Upgrade Scheme

The Boiler Upgrade Scheme gives property owners in England and Wales a grant towards replacing fossil fuel heating with low carbon heating. The installer applies for the grant and takes it off the customer’s bill.

  • £7,500 towards an air source (air-to-water) or ground source heat pump.
  • £2,500 towards an air-to-air heat pump.
  • An extra £1,500 (£9,000 in total) for an air source or ground source heat pump in homes heated by oil or LPG with no mains gas connection. Applications must be made between 21 July 2026 and 31 March 2027, and self-build properties don’t qualify.
  • The property owner must be replacing a fossil fuel or direct electric system. Hybrid systems that keep a gas boiler are not eligible, and there is one grant per property.
  • Once a voucher is issued, the installer has 3 months to install an air source or air-to-air heat pump and claim the grant (6 months for ground source).
  • Installers must be MCS certified. Ofgem’s latest installer guidance (version 5.2, October 2026) says installers must work under MCS’s redeveloped installer scheme and log in to the BUS portal with GOV.UK One Login.

Rules and grant values change, so check GOV.UK and Ofgem’s current installer guidance before quoting a customer.

Common mistakes to avoid

  • Sizing the heat pump to the old boiler instead of a heat loss calculation.
  • Leaving existing radiators in place without checking their output at the design flow temperature.
  • Running high flow temperatures “to be safe”, which wrecks efficiency and running costs.
  • Undersized pipework or missing buffer and volume checks, leading to short cycling.
  • Poor siting: units boxed in, blowing cold air at a neighbour’s window, or draining defrost water onto a path.
  • Forgetting the DNO notification, or not checking maximum demand on the supply.
  • Ignoring the R290 safety zone, such as fitting a unit right under an opening window.
  • A poor handover: customers need to know that heat pumps run low and slow, and how to use the controls.

Skills and next steps

Heat pump work crosses trades: heating design, plumbing, electrical and refrigeration. If you’re starting out, a recognised heat pump installation qualification is the usual route to MCS certification, alongside your core trade qualifications. Brush up on safe isolation and testing too, because every heat pump install adds a new circuit to the board. Our heat pump installer career guide sets out the routes in.

Sources: GOV.UK: Boiler Upgrade Scheme, what you can get; GOV.UK: Boiler Upgrade Scheme eligibility; Ofgem: BUS guidance for installers, v5.2; The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2025; Planning Portal: air source heat pumps; Energy Networks Association: when to contact your network operator; MCS: notifying DNOs; MCS: MIS 3005-D heat pump design standard; Baxi: F-gas certification and ASHPs; Heat Pump Association: R290 safety zone statement.

Photo: alpha innotec / Pexels

Share article

Was this article helpful?