Development: Site opened and report published 19 November 2026
Plumbing and heating merchant Wolseley has opened a 100,000 sq ft fulfilment centre in Darlington to supply large heat pump and renewables projects.
The site was opened by Martin McCluskey MP, Minister for Local Energy and Jobs. It stores products centrally and delivers them direct to site for installers, housebuilders and large contractors.
Report warns of supply chain strain
Wolseley published a supply chain report on the same day. It predicts that:
- Heat pump demand will grow about fivefold between 2026 and 2030.
- Lorry trips to and from warehouses will rise 71% within three years.
- Logistics networks will need twice their current space within three years.
- Supply chains need at least three to five years to prepare.
Glen Scorah, Wolseley’s UK sales and operations director for contract, said heat pumps are bigger, heavier and more complex to deliver than gas boilers.
What Wolseley wants from government
The company wants stable policy and installation targets beyond 2030, and a clear answer on whether there will be a phase-out date for fossil fuel heating. It also wants help to cut emissions from freight, including a fuel duty cut on HVO fuel, and investment in logistics skills.
What it means for installers
A heat pump, cylinder and buffer tank take up far more space than a combi boiler. For installers on bigger contracts, direct-to-site delivery can save trips to the branch and storage at the yard. Smaller installers may still face longer lead times on some models as demand grows.
Sources · PHAM News
Main image: tall warehouse shelves filled with boxes. Photo by Sebastian Schuster on Unsplash.
Share article
Was this article helpful?
Thanks — that helps us improve these guides.



