Supplier feedback due on 27 November 2026.
Housing association Notting Hill Genesis has given contractors until Friday 27 November to comment on a proposed £540m framework for building safety work. The scope includes cladding, roof repairs and fire protection.
The latest market engagement notice describes two proposed lots, one for less complex work and one for complex projects. The association wants views on whether the split makes sense, what contractors should have to show to take part and how it should score bids. It has invited suppliers to respond through a survey following a meet-the-buyer event listed for 20 November.
The proposed scope includes work to façades and cladding, replacement windows and doors, roof refurbishment, fire safety measures and structural repairs. It also covers associated internal work and design and compliance services. The association intends to use the framework for its own building safety programme. Other eligible contracting authorities may be able to use it as well.
The notice estimates the combined value of the framework and work ordered through it at £540m before VAT, or £648m including VAT. The calculation takes account of potential use by other buyers. The actual value of work coming to market will depend on what buyers order during the agreement. The provisional framework term runs for four years, from September 2027 to September 2031.
For specialist firms, the question is how clearly the final documents distinguish between smaller packages and jobs that need several trades and a larger design team. The lot descriptions and participation requirements will determine which firms can tender directly. The current request for feedback gives contractors a chance to explain where the proposed boundaries could affect participation.
The indicative timetable puts the first pre-qualification stage in January 2027, invitations to shortlisted bidders in March and award in August. Those dates are provisional. Friday’s deadline is for feedback on the plan, with applications to join the framework due under a later notice.
Sources · Latest Find a Tender market engagement notice · Published notice text and timetable
File photograph of construction scaffolding in Tottenham, taken on a separate project. Photograph by Acabashi · CC BY-SA 4.0. Resized without cropping.
Share article
Was this article helpful?
Thanks — that helps us improve these guides.



