Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
product
Filter by Categories
Bricklaying
Carpentry
Construction
Design
Electrical
Gas
Green Energy
Health and safety
High voltage
Newsroom
Painting and decorating
Plastering
Plumbing
Product
Tiling
Tools and equipment

Try our free simulation training now. Get started >

Byrne Bros looks to infrastructure as London new-build stays subdued

Illustration identifying Byrne Bros’ HS2, energy and defence workload

Company annual report · October 2026

Infrastructure work is expected to remain Byrne Bros’ main source of work as opportunities for new buildings in London stay subdued, according to parent company WBHO’s 2026 integrated report.

The report identifies secured work on HS2 at Area Central and the West Ruislip portal, an energy-from-waste facility and a defence project at RAF Molesworth for Skanska. WBHO says those contracts provide a base of work heading into its 2027 financial year.

Elsewhere in Byrne Group, Ellmer’s awards include KYN Kensington, Brighton College and further work at Lord’s Cricket Ground. WBHO points to refurbishment and repurposing as sources of demand while financing costs and regulation continue to constrain new development.

The annual report distinguishes between new construction and the reuse of existing buildings. It identifies hotel and office refurbishment as continuing opportunities in the UK market, while warning that inflation and interest rates could further weaken the affordability of new residential and commercial projects.

The shift was already visible in WBHO’s interim statement for the six months to 31 December 2025. Published in March 2026, that report said Byrne Group revenue fell 12% to £84m. Lower activity at Byrne Bros was partly offset by growth at Ellmer Construction.

The earlier report described Byrne Bros as a specialist in concrete substructures, superstructures and infrastructure. It said Ellmer worked across new-build, refurbishment and fit-out projects, including residential, commercial, hotel and leisure schemes. O’Keefe’s activities included demolition, enabling works, remediation and groundworks.

Those different activities mean conditions can vary within the same group. A softer market for new buildings does not necessarily describe demand for major rail structures or the refurbishment of existing premises. The parent company’s reports point to that contrast in its UK workload rather than a uniform recovery across construction.

Sources · WBHO integrated report 2026, UK operational report, page 57 · WBHO interim statement for six months ended 31 December 2025, published March 2026

More construction news

Editorial illustration of secured workload identified in WBHO’s 2026 annual report, page 57. Image credit: TradeFox original editorial illustration · Original TradeFox graphic.

Editorial standards and corrections

Share article

Was this article helpful?

Real, sourced news for the UK trades.

Byrne Bros looks to infrastructure as London new-build stays subdued

Secret Link