Fibre optic link loss budget

L=ℓα+ncLc+nsLs+Lo
where
L
link loss budget (dB)
ℓ
fibre length (km)
α
fibre attenuation (dB/km)
nc
number of mated connector pairs
Lc
loss per connector pair (dB)
ns
number of splices
Ls
loss per splice (dB)
Lo
other losses (dB)
Explain this equation

Works out the most loss a fibre link should show on test, so you can judge a light source and power meter reading.

α is the fibre loss per kilometre at the wavelength you test at: 3.5 dB/km at 850 nm under ISO/IEC 11801, or 3.0 dB/km for OM3 to OM5 under the current TIA-568.3-D. Each mated connector pair and each splice gets a fixed allowance, at most 0.75 dB per connector pair and 0.3 dB per splice.

Losses in decibels simply add, so the budget is the fibre loss plus every connection.

Sense check: 500 m of OM3 at 3.0 dB/km with two connector pairs and one splice is 1.5 + 1.5 + 0.3 = 3.3 dB at the maximum allowances.

Watch out: the length must be in kilometres in the formula; the calculator converts metres for you. Remember the connectors at both ends.

Works out the maximum insertion loss you should expect from a fibre link, to compare with the reading from a light source and power meter. Add the fibre attenuation times the length, the allowance for each mated connector pair and each splice, and any other components.

The usual maximum allowances are 0.75 dB per mated connector pair and 0.3 dB per splice. For fibre, enter the attenuation for your cable and wavelength: ISO/IEC 11801 and the older TIA-568-C.3 use 3.5 dB/km at 850 nm and 1.5 dB/km at 1300 nm for multimode, while the current ANSI/TIA-568.3-D uses 3.0 dB/km at 850 nm for OM3, OM4 and OM5. Premises singlemode is 1.0 dB/km (0.5 dB/km for outside plant). Use the system designer's or manufacturer's tighter values where specified.

dB/km
count
dB
count
dB
dB

Enter your values to see the result.

The tools calculate the displayed equation. They do not automatically choose cable sizes, approve installations, supply current regulatory tables, certify equipment or replace inspection and testing.