Stair geometry
Vertical clearance to a level soffit
- where
- pitch-line height (mm)
- pitch-line datum height (mm)
- horizontal distance (mm)
- rise (mm)
- going (mm)
- headroom clearance (mm)
- soffit level (mm)
Explain this equation
Checks the vertical clearance between a stair's pitch line and a level ceiling or beam above it, at any point along the flight.
h0 is the height of the pitch line at a known starting point. x is the horizontal distance from there. r and g are the rise and going. hp is the pitch-line height at that point. zs is the level of the soffit above, and hc the vertical clearance. All are in millimetres on one datum.
The pitch line climbs r for every g travelled horizontally, so at distance x it has risen x × r/g. Subtracting that line's height from the soffit level gives the clearance.
Starting at 0 with a 200 mm rise and 250 mm going, the line is 800 mm up after 1000 mm. A soffit at 3000 mm leaves 2200 mm clear.
Watch out: all heights must share one datum. This is not a full headroom or regulations check.
Calculate vertical clearance above a straight pitch line at a specified horizontal station.
Enter your values to see the result.
Good to know
All levels share one datum; distance is horizontal from a stated pitch-line point. Geometry only, not a complete headroom or building-regulations check.
Limits
Building guidance differs across UK nations. Stair geometry must be checked against the applicable nation, building use and project requirements.
Sources
This is a calculation aid, not a structural design or compliance certificate. Every default is an example, not a specification for your project.
Worked example
Checking a loft stair with a 195 mm rise and 230 mm going, where the trimmer above is 4000 mm above the bottom nosing, measured 2300 mm along the flight: hp = 0 + 2300 × 195 ÷ 230 = 1950 mm; hc = 4000 − 1950 = 2050 mm. Run the check at a few distances, as the clearance falls the further up the flight you go.
Common questions
Where is the worst point for headroom?
Usually directly under the edge of the opening or trimmer, because beyond it the ceiling is no longer above you. Check at that position.
Should I measure to the finished ceiling or the joists?
To the lowest finished surface, such as plasterboard or a beam casing. Joists measured before boarding will leave you short.
What if the clearance is too low?
You may need to move the stair opening, change the pitch or use a different stair type. Check against the rules that apply before you cut any joists.