Tradefox

Tradefox – Build Skills

Learn Construction

‹ All steelwork calculators

Column bases

Holding-down bolt projection above concrete

P=g+tp+tw+mn+nt·p
where
P
required projection above concrete (mm)
g
grout gap (mm)
tp
base plate thickness (mm)
tw
washer thickness (mm)
mn
nut height (mm)
nt
full threads beyond the nut
p
thread pitch (mm)
Explain this equation

Works out how far a holding-down bolt must stand above the concrete so the nut is fully engaged. Use it when specifying cast-in bolts or checking them before erection.

g is the grout gap under the base plate, t_p the plate thickness and t_w the washer or plate washer. m_n is the nut height. n_t is how many full threads should show beyond the nut and p is the thread pitch. P is the minimum projection.

Everything stacked on the bolt simply adds up: grout space, plate, washer and nut, then a short length of thread to prove the nut is fully on. BS EN 1090-2 wants at least one full thread beyond the nut.

Sense check: an M24 with a 40 mm gap, 25 mm plate, 6 mm washer and 21.5 mm nut, plus two threads, needs about 100 mm.

Watch out: bolts can be cast up to 5 mm low and still be within tolerance, so leave a few millimetres in hand.

Minimum length of holding-down bolt that must stand above the foundation so the nut is fully engaged once the grout gap, base plate and washer are in place.

ratio
mm

Enter your values to see the result.

Good to know

BS EN 1090-2 cl. 8.2.2 requires the bolt end to protrude beyond the nut after tightening; at least one full thread, one or two is ideal. SCI guidance gives the top of bolt level as +25 mm to −5 mm of the specified level, so a bolt cast 5 mm low must still give full nut engagement. A typical grout gap is 25–50 mm. Bolt holes in base plates are usually 6 mm over the bolt diameter (NSSS), with loose plate washers.

Common mistake

Forgetting the grout gap or plate washer when specifying cast-in bolts, leaving the nut short of full engagement.

Limits

Geometry only. Embedment, anchorage and bolt capacity are the designer’s responsibility.

Sources

Results are calculations from the published methods and figures shown, and depend on the data you enter. Always work to the engineer’s drawings and bending schedules, BS 8666, BS EN 1992, BS EN 1090-2, BS 5531/the BCSA National Structural Steelwork Specification and manufacturers’ data. Lifting must be planned under LOLER by a competent person.

Secret Link