Quantities
Paving units & bedding
- where
- pavers to order
- area (m²)
- paver length (mm)
- joint (mm)
- paver width (mm)
- waste (%)
- bedding volume (m³)
- bed depth (mm)
Explain this equation
This estimates how many rectangular paving units to order for an area, and the volume of bedding material under them.
A is the area in m². L and W are the paver length and width and j is the joint, all in mm. N is the number of pavers including the waste w. d is the bed depth in mm and V_b is the bedding volume in m³.
Each paver with a joint on two sides covers (L + j)(W + j) mm². There are 1 000 000 mm² in a square metre, so that gives pavers per m²; multiplying by area and (1 + w/100) gives the order, and the ⌈ ⌉ brackets round up. The bed is area times depth, divided by 1000 to turn mm into m.
A 200 × 100 mm paver with a 5 mm joint gives about 46.5 per m². Twenty square metres with 5% waste is 976 pavers. A 40 mm bed over 20 m² is 0.8 m³.
Watch out: cuts, laying patterns and compaction all change the real quantities.
Estimate rectangular pavers and a uniform bed.
Enter your values to see the result.
Good to know
Use the specified laying orientation, joints and bedding system. Cuts, pattern and compaction can alter actual quantities.
Sources
Estimates are not design approval or British Standards compliance checks. Structural arch, retaining-wall, wind, foundation, lintel and masonry-capacity design are not performed. Use the project engineer’s specification.