Tradefox toolbox talks
Source and A4 review

25 November 2026 · 38 supplied PDFs · 112 procedure illustrations removed · Seven original pages retained, plus one source-reference page per talk.

Review basis: the supplied PDFs were reviewed against the linked HSE, IET, NHS, regulator and statutory sources. The A4 check uses published IET guidance on BS 7671:2018+A4:2026. The full licensed standard was not available: this is not a clause-by-clause verification or installation-compliance certificate. Six talks have a direct electrical interface; the others use their subject-specific sources. Site rules are identified separately from statutory requirements. GB legislation applies unless another nation is specified; environmental record periods are for England.

All eight pages of all 38 PDFs rendered successfully. The original logos, attendance forms and QR codes are retained; the vector procedure illustrations and their empty poster panels are removed. The original Downloads files are untouched.

Contents: 01 · 02 · 03 · 04 · 05 · 06 · 07 · 08 · 09 · 10 · 11 · 12 · 13 · 14 · 15 · 16 · 17 · 18 · 19 · 20 · 21 · 22 · 23 · 24 · 25 · 26 · 27 · 28 · 29 · 30 · 31 · 32 · 33 · 34 · 35 · 36 · 37 · 38

01. Correct isolation

Reviewed PDF

A4-related review: suitable isolation devices (Table 537.4) and multiple supplies, including PV, batteries and vehicle-to-building supply. The safe-work sequence is based on HSG85/GS38, not a PENfault campaign threshold. No 15 mA pass/fail limit is asserted.

PageOriginal wordingRevised wording
1The seven steps to correct electrical isolationSeven steps for safe electrical isolation
1Step 2: isolate and lock off every other supply, such as solar PV, batteries, UPS, generators and EV chargers.Step 2: check for danger before touching equipment. Competent people assess supply faults, including diverted neutral current, where relevant.
1Step 3: check your test equipment and prove your GS38 voltage indicator on a proving unit or known live source.Step 3: isolate the circuit from ALL sources: mains, PV, batteries, UPS, generators and any vehicle-to-building supply. Do not rely on an off button.
1Step 4: check the main head for tracking, clamp the main earth for current, and test accessible metalwork.Step 4: use suitable isolating devices, lock off and label each source. Secure against reconnection and make stored energy safe.
1Step 5: if you find current or voltage, stop. You are now fault finding. Report supply faults to the DNO on 105.Step 5: check a suitable two-pole voltage detector, then prove it works on a proving unit or suitable known live source before testing.
1Step 6: prove dead at the point of work, testing between every conductor, including every line on three-phase.Step 6: prove dead at the point of work: test all relevant conductor combinations, including line-to-line, line-to-neutral and line-to-earth.
2Use a GS38 two-pole voltage indicator with fused leads and finger guards.Use a suitable two-pole detector meeting GS38 guidance. Additional fuses are not required for every detector.
2Clamp the main earth before you start. PENfault treats readings above 15mA as potentially dangerous.Only competent people assess earth or bonding current. A low reading does not prove there is no PEN fault.
2Don't trust an inverter, battery or EV charger's 'off' state. Isolate upstream and prove dead.Don't trust an inverter or charger's off state. Isolate ALL feeds using its safe shutdown procedure and prove dead.
2If it goes wrong: If someone gets an electric shock, don't touch them until the supply is off. Call 999 and get a first aider. If you find a dangerous supply-side fault, keep people away from exposed metalwork and report it to the DNO on 105.If it goes wrong: Do not touch a casualty or suspect metalwork until every source is made safe. Call 999 and get a first aider. Stop if danger is found; only competent, authorised people may investigate. Report supply faults on 105 in Great Britain.
42. Which of these should never be used to prove dead?2. Which instrument should be used to prove dead?
4A proving unitA non-contact detector
52. A multifunction tester or volt stick2. A GS38 two-pole voltage indicator
5PENfault says MFTs and multimeters must not be used to prove dead, and a non-contact indicator is a supplementary check only.HSE recommends a suitable voltage detector. Non-contact indicators cannot prove dead; a proving unit checks the detector.
5PENfault's step 1 is permission and planning: get permission, identify every supply and complete your risk assessment.Plan the work, obtain authority and identify all sources before isolation. Follow the site safe system of work.
5PENfault says to clamp the main earth before you start. A reading above 15mA is potentially dangerous, so stop and investigate.Earth or bonding current can indicate danger. No clamp reading proves a PEN fault absent; stop and escalate concerns to a competent person.
5PENfault says report supply-side faults to the Distribution Network Operator on 105 and keep a log.Report supply-side faults to the network operator: 105 in Great Britain. In Northern Ireland, use NIE Networks emergency contact.
6Clamp the earth before you startCheck for danger before touching
7Clamp the earth before you startCheck for danger before touching
1HSE says most electrical accidents happen because people work on equipment they think is dead but which is live. Modern installations can have more than one source, such as solar, batteries and EV chargers, and a PEN fault can put current on earth and bonding even when the main switch is off.HSE warns of accidents on equipment assumed dead but still live, and live work without adequate precautions. Installations may have multiple sources: mains, PV, batteries and bidirectional EV systems. A PEN fault can put dangerous current on earth or bonding even with the main switch off.

02. Working at height: ladders

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1Ladders are only acceptable when a risk assessment shows that better fall protection, like a tower or platform, is not justified. Falls from ladders happen when the ladder is damaged, badly placed, not secured, or the user overreaches. A few simple checks and habits stop most of them.Use a ladder only where the risk assessment justifies it. Damage, poor placement, insecure footing and overreaching can cause falls. Choose suitable equipment, check it and follow safe climbing and working practices.

03. Asbestos awareness

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

04. Silica dust

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1HSE says over 500 construction workers are believed to die from exposure to silica dust every year. The fine dust is too small to see in normal light, and breathing it in regularly can cause lung cancer, silicosis, COPD and asthma. Under COSHH, employers must protect workers from hazardous construction dust, and you play your part by using the controls every time.HSE estimates over 500 construction workers die each year from silica exposure. Fine respirable dust may be invisible in normal light. Silica can cause lung cancer, silicosis and COPD; other construction dusts can cause asthma. Under COSHH, employers must control hazardous dust. Use the controls every time.

05. Manual handling

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

06. PPE: the right kit and why

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1This covers employees and, since April 2022, most casual and agency workers too. It does not cover the self-employed.This covers employees and limb (b) workers. Genuine self-employed people have their own duties; a job label alone does not decide employment status.

07. Underground services

Reviewed PDF

A4 interface: locating/protecting existing cables and correct isolation. The 500 mm site rule is not an A4 burial-depth requirement. HSG47 and the service owner govern the excavation method.

PageOriginal wordingRevised wording
1Keep power tools at least 500 mm from the marked line of a service.Site rule: powered digging stays 500 mm clear; agree any greater owner clearance.
2If it goes wrong: If an excavator hits a cable, the driver should stay in the cab and everyone else should keep well away from the excavation, the machine and the cable. If you smell gas, don't try to repair it: get everyone clear, put out any flames, call the National Gas Emergency number 0800 111 999 and tell your supervisor.If it goes wrong: After a cable strike, stay in the cab, keep others away and contact the network operator. Call 999 for injury or fire. For a gas escape, move clear and avoid ignition sources. Call 0800 111 999 (GB) or 0800 002 001 (NI) from safety.
42. How close can power tools be used to the marked line of a service?2. What is the minimum powered-digging clearance in this talk's site rule?
5HSG47 says only use power tools 500 mm or more from the indicated line of a service.This talk uses a conservative site rule. HSG47 has task-specific 500 mm guidance and exceptions; agree the method and owner requirements.

08. Carbon monoxide awareness

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1Never run petrol equipment indoors or in enclosed spaces unless ventilation has been fully assessed.Use petrol generators outside, away from openings. Any exceptional enclosed use needs expert assessment and suitable mechanical extraction.
1Yellow or orange flames, soot or staining on appliances point to a CO problem.Soot or unexpected yellow flames can warn of CO. Fuel-effect flames may be yellow.

09. Slips, trips and housekeeping

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

10. Mental health and looking out for a mate

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

11. Scaffolding

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

12. Noise and hearing

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1At 85 dB(A) hearing protection is a must, and the area should be a marked hearing protection zone.At 85 dB(A) daily/weekly exposure, control the noise and enforce protection. Mark hearing protection zones where required; peak noise matters too.

13. Hand-arm vibration

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
5https://www.hse.gov.uk/vibration/hav/readyreckoner.htmhttps://www.hse.gov.uk/pubns/priced/l140.pdf

14. Fire and hot works

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

15. Working in heat, cold and sun

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
4Move them somewhere cool, give water if they can drink, and get helpCall 999 and start cooling them while waiting
55. Move them somewhere cool, give water if they can drink, and get help5. Call 999 and start cooling them while waiting
5Confusion can be a sign of heatstroke, which is an emergency. Cool them and call 999 if it's serious.Confusion in the heat can indicate heatstroke. Call 999, move them to a cool place and cool their skin while waiting.
2If it goes wrong: If someone is confused, very hot with skin that isn't sweating, has a fit or collapses, call 999. It could be heatstroke. Move them somewhere cool, remove extra clothing, cool their skin with water and fan them. If they become unconscious, put them in the recovery position and stay with them.If it goes wrong: Confusion, a fit or collapse in the heat can mean heatstroke: call 999. Move them somewhere cool, remove extra clothing and cool their skin with water and a fan. If unresponsive but breathing normally, use the recovery position. If not breathing normally, start CPR and follow the call handler.

16. Plant and vehicles

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1HSE says about 7 workers die and 93 are seriously injured each year in vehicle and plant accidents on construction sites. Most happen because people and vehicles aren't kept apart.Moving vehicles and plant can kill or seriously injure people. HSE identifies poor separation of pedestrians and vehicles as a major cause of construction transport accidents. Keep them apart.
1Make eye contact with the operator before you approach. Assume they can't see you.Keep out of the working area until the operator acknowledges you, stops and makes the plant safe. Eye contact alone is not permission to approach.
4Make eye contact with the operatorGet the operator to stop and acknowledge you
54. Make eye contact with the operator4. Get the operator to stop and acknowledge you
5Assume the operator can't see you until you've made eye contact and had a signal.Stay outside the operating area until the operator has stopped and made it safe for you to approach.
6Make eye contact firstWait until the plant is made safe
7Make eye contact firstWait until the plant is made safe

17. Excavations and trenches

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1Inspection reports must be recorded, at least once every 7 days.Record inspections under CDM regulation 24; event reports must not wait a week.

18. Confined spaces

Reviewed PDF

A4 interface: Section 706 concerns conducting locations with restricted movement. Not every confined space falls within that scope. A competent electrical designer must select the applicable protective measures.

PageOriginal wordingRevised wording
1Never go in to rescue someone without breathing apparatus and training. You could be the next casualty.Never attempt an unplanned entry rescue. Only trained rescuers with the equipment specified in the rescue plan may enter.
2If it goes wrong: If someone collapses in a confined space, don't go in. Raise the alarm, call 999 and tell them it's a confined space. Only trained rescuers with breathing apparatus should enter.If it goes wrong: Do not enter after a casualty. Raise the alarm, call 999 and state that it is a confined space. Follow the planned rescue arrangements. Entry rescuers need suitable training and equipment, including breathing apparatus if the atmosphere requires it.
6Never rescue without BANo unplanned entry rescue
7Never rescue without BANo unplanned entry rescue

19. First aid and reporting accidents

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1Your employer or the person in control of the site makes the RIDDOR report. Self-employed people report their own.The responsible person makes the RIDDOR report: usually the employer or premises controller. Self-employed duties depend on where the event happens.
4The employer or person in control of the siteThe responsible person (see presenter notes)
53. The employer or person in control of the site3. The responsible person (see source reference page)
5RIDDOR places the duty on employers and people in control of work premises. Self-employed people report their own injuries.Employers report for employees. For self-employed injuries on another work premises, its controller usually reports; own/domestic premises differ.
1Every site must have a stocked first aid box and someone appointed to take charge of first aid.Every site needs suitable first aid equipment and an appointed person. The first aid needs assessment decides what trained first aid cover is required.
2Don't give first aid you're not trained to give, beyond keeping someone safe and calling for help.Call 999 and follow the call handler. Anyone can use an AED; start CPR if someone is unresponsive and not breathing normally.

20. Drugs and alcohol

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
2If it goes wrong: If someone is unfit for work, stop them doing safety-critical tasks and tell your supervisor. If they're unwell or unconscious, call 999 and put them in the recovery position if you're trained. Confidential help: FRANK 0300 123 6600, Drinkline 0300 123 1110, Construction Industry Helpline 0345 605 1956.If it goes wrong: Stop an unfit person doing safety-critical work and tell your supervisor. Call 999 for unconsciousness or serious illness. If not breathing normally, start CPR and follow the call handler. If breathing normally, use the recovery position. Support: FRANK 0300 123 6600; Drinkline 0300 123 1110.

21. CDM 2015: what it means on site

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1CDM applies to all construction work, from small domestic jobs to major projects.CDM 2015 covers construction in Great Britain, including domestic work.
1Different people have duties: clients, designers, principal designers, principal contractors, contractors and workers.Clients, designers, contractors and workers have duties. Principal designers and principal contractors are required where more than one contractor is involved.

22. Risk assessments and method statements

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

23. Speaking up and stopping unsafe work

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
5https://www.hse.gov.uk/contact/concerns.htmhttps://www.hse.gov.uk/contact/tell-us-about-a-health-and-safety-issue.htm

24. Hazardous substances (COSHH)

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1Hazardous products have hazard symbols on the label. Read the label and hazard statements before use.Check labels and hazard statements, but do not rely on symbols alone. Dust, fumes and some other harmful substances may have no product label.

25. Skin problems from work

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
5https://www.hse.gov.uk/skin/employ/dermatitis.htmhttps://www.hse.gov.uk/skin/employ/whatare.htm

26. Welfare facilities on site

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

27. Power tools and abrasive wheels

Reviewed PDF

A4 interface: equipment supply/protection and correct isolation. Single-phase 110 V centre-tapped-to-earth is 55 V to earth. The current standard and site design govern the actual installation.

PageOriginal wordingRevised wording
1Reduced voltage, such as 110 V centre-tapped to earth, halves the voltage to earth and is widely used on sites.A single-phase 110 V centre-tapped-to-earth supply has 55 V from either live conductor to earth. Reduced voltage lowers, but does not remove, shock risk.
4Halves the voltage between a live wire and earth55 V from each live conductor to earth
53. Halves the voltage between a live wire and earth3. 55 V from each live conductor to earth
5HSE says a centre-tapped to earth transformer halves the voltage between a live wire and earth, reducing shock risk.For a single-phase 110 V centre-tapped supply, each live conductor is 55 V to earth. The risk of electric shock remains.

28. Temporary works

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

29. Lifting operations and slinging

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

30. Overhead power lines

Reviewed PDF

A4 interface: existing overhead-line hazards. Working clearances must come from the network/line owner and GS6 planning; no blanket A4 clearance is claimed.

PageOriginal wordingRevised wording
2If it goes wrong: If plant touches a line, stay in the cab, warn everyone to keep away and tell the network operator straight away (105 in England, Scotland and Wales; Northern Ireland Electricity on 03457 643 643). Try to drive clear if you can. If you must leave because of fire, jump clear. Don't climb down the steps. If someone is hurt, call 999.If it goes wrong: Stay in the cab, keep others away and call the network operator: 105 (GB), 03457 643 643 (NI). Drive clear only if safe. If fire forces escape, jump clear without touching the machine and ground together; move away with feet together. Call 999 for injury or fire.

31. Mobile elevating work platforms (MEWPs)

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1MEWPs are one of the safest ways to work at height, but only when used properly. The main dangers are falling from the basket, the machine overturning, people being trapped against something overhead, and hitting people, vehicles or overhead cables.MEWPs provide access for work at height and need careful selection and use. Main dangers include falls, overturning, overhead trapping, and collisions with people, vehicles or overhead cables.

32. Roof work and fragile surfaces

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1Almost one in five construction deaths involve roof work. Falls through fragile surfaces, like rooflights and fibre-cement sheets, cause about a fifth of construction deaths from falls from height, and small, quick jobs are some of the worst for it.Roof work and fragile surfaces can cause fatal falls. HSE highlights rooflights and fibre-cement sheets, and warns that short maintenance and cleaning jobs also need full precautions.

33. Mobile tower scaffolds

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

34. Site inductions and new starters

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

35. Working near the public

Reviewed PDF

Not directly applicable to the claims in this talk.

No substantive wording change identified in this review. Illustrations removed; source mapping added.

36. Pollution and spills

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1Fuel, oil, concrete wash water and even muddy water can kill wildlife and poison rivers and groundwater. Pollution is a criminal offence, and the penalties can include an unlimited fine, up to 5 years in prison and the cost of the clean-up.Fuel, oil, concrete wash water and muddy water can harm wildlife, rivers and groundwater. Causing pollution can be a criminal offence and lead to fines, prosecution and clean-up costs. Detailed rules differ between UK nations.
1Pump silty water from excavations into a settlement tank or lagoon, never straight into a drain or stream.Use an approved treatment and disposal route for silty water. Settlement alone does not authorise discharge; obtain any required permit or consent.
2If it goes wrong: Stop the source if it's safe, then contain the spill with the spill kit and block nearby drains. Tell your supervisor straight away. If anything reaches a drain, watercourse or the ground, report it at once: in England and Northern Ireland call 0800 80 70 60, in Scotland call SEPA on 0800 80 70 60 or report online, and in Wales call Natural Resources Wales on 0300 065 3000.If it goes wrong: Stop the source only if safe. Contain the spill, protect drains and tell your supervisor. Report pollution promptly: England/NI 0800 80 70 60; Wales 0300 065 3000. In Scotland report online to SEPA; its 0800 80 70 60 line is staffed Mon-Fri, 8am-6pm. Call 999 for immediate danger to life.

37. Waste and recycling on site

Reviewed PDF

Not directly applicable to the claims in this talk.

PageOriginal wordingRevised wording
1Every load that leaves site needs a waste transfer note. In England, keep copies for 2 years.In England, non-hazardous transfers need a transfer note or equivalent. A valid season ticket can cover repeat loads. Keep the records for 2 years.
1Hazardous waste needs extra paperwork. In England, records must be kept for 3 years.In England, hazardous waste normally needs a consignment note. Producers keep the site register for 3 years. Check national rules before transfer.

38. Electrical safety on site

Reviewed PDF

A4-related review: temporary construction installations need competent design using the applicable requirements, including Section 704 where in scope. Select RCD type/protection for the actual loads; an RCD cannot substitute for sound equipment or correct isolation.

PageOriginal wordingRevised wording
1Use cordless tools, or 110 V tools on a centre-tapped supply, so no more than 55 V is to earth.Use cordless tools, or single-phase 110 V tools on a centre-tapped-to-earth supply: 55 V from each live conductor to earth.
1Any 230 V equipment should be protected by an RCD that trips at 30 mA or less.Use suitable RCD protection of 30 mA or less for 230 V portable tools.
2Check the tool's inspection label is in date before you use it.Do the pre-use check and follow the inspection schedule. A test label alone does not prove a tool is safe.
2If it goes wrong: If someone gets an electric shock, don't touch them until the supply is off. Switch off at the plug or isolator, call 999 and get a first aider. Take the tool or lead out of use and tell your supervisor.If it goes wrong: Do not touch a casualty until the equipment and all relevant supplies are made safe. Call 999 and get a first aider. Do not approach damaged cables or metalwork. Take faulty equipment out of use and tell your supervisor.
41. What is the maximum voltage to earth on a 110 V centre-tapped supply?1. On single-phase 110 V centre-tapped-to-earth, what is each live to earth?
5A 110 V centre-tapped to earth supply means the voltage to earth doesn't exceed 55 V.Single-phase 110 V centre-tapped-to-earth is 55 V to earth; a three-phase 110 V system is different (about 64 V).
45. How often does HSE suggest users check 110 V tools on construction sites?5. What is the pre-use checking rule in this toolbox talk?
4WeeklyBefore every use
55. Weekly5. Before every use
5HSE's suggested construction intervals: user checks weekly, a formal visual inspection monthly, and a test every 3 months.Check before every use. Formal inspection and test intervals follow a risk-based maintenance plan; there is no universal annual PAT requirement.
5HSE says the RCD should trip at not more than 30 milliamps.Use a suitable RCD rated 30 mA or less for additional protection. It cannot protect against every electric shock or replace safe equipment.