{"id":18945,"date":"2026-06-05T08:17:34","date_gmt":"2026-06-05T08:17:34","guid":{"rendered":"https:\/\/tradefoxapp.com\/?p=18945"},"modified":"2026-06-05T08:20:31","modified_gmt":"2026-06-05T08:20:31","slug":"earth-bonding","status":"publish","type":"post","link":"https:\/\/tradefoxapp.com\/fr\/earth-bonding\/","title":{"rendered":"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"18945\" class=\"elementor elementor-18945\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bd69d62 e-flex e-con-boxed e-con e-parent\" data-id=\"bd69d62\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-cfb4151 elementor-widget elementor-widget-text-editor\" data-id=\"cfb4151\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Earth bonding is one of those topics that sounds straightforward on paper and then catches half the trade out when it comes to inspection day. Inspectors fail installations every week over it. Not because the work is hard, but because the rules are misunderstood, the testing is skipped, or someone bonded a sink that never needed bonding while leaving the gas service sitting un-clamped six feet from the meter.<\/span><\/p><p><span style=\"font-weight: 400;\">This guide walks through the distinction between main protective bonding and supplementary bonding under BS 7671, what an inspector looks for first in a domestic property, and the small details that turn a satisfactory EICR into an unsatisfactory one.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-1648910 e-flex e-con-boxed e-con e-parent\" data-id=\"1648910\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f6d514b elementor-widget elementor-widget-heading\" data-id=\"f6d514b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Earthing vs Earth Bonding: Get The Terms Right\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fdbd47d elementor-widget elementor-widget-text-editor\" data-id=\"fdbd47d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Before anything else, the language matters. Earthing and bonding use the same green and yellow conductors, but they do entirely different jobs.<\/span><\/p><p><span style=\"font-weight: 400;\">Earthing connects exposed-conductive-parts (the metalwork of the electrical installation itself, such as metal enclosures, back boxes, and the consumer unit casing) to the Main Earthing Terminal (MET) so that a fault current has a path back to source. That path is what allows the protective device to operate.<\/span><\/p><p><span style=\"font-weight: 400;\">Earth bonding connects extraneous-conductive-parts (metal that is not part of the electrical installation but could introduce a potential into the building, typically incoming metallic gas and water pipes) to the same MET. The aim is to keep everything at the same potential during a fault, so a person touching two metal parts at once does not become the path between them.<\/span><\/p><p><span style=\"font-weight: 400;\">Le<\/span><strong><a href=\"https:\/\/electrical.theiet.org\/wiring-matters\/years\/2019\/75-may-2019\/to-bond-or-not-to-bond\/\"> IET defines an extraneous-conductive-part<\/a><\/strong><span style=\"font-weight: 400;\"> as &#8220;a conductive part liable to introduce a potential, generally Earth potential, and not forming part of the electrical installation.&#8221; All three conditions have to be met. That definition is the source of more EICR disagreements than almost any other point in the regs. <\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-36f9d9b e-flex e-con-boxed e-con e-parent\" data-id=\"36f9d9b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-428a70a elementor-widget elementor-widget-heading\" data-id=\"428a70a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Main Protective Bonding: What BS 7671 Requires\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4afece7 elementor-widget elementor-widget-text-editor\" data-id=\"4afece7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Main protective bonding is the non-negotiable part. Regulation 411.3.1.2 requires main protective bonding conductors to connect any extraneous-conductive-parts to the MET. In a typical UK domestic property, that means the incoming metallic gas pipe and the incoming metallic water pipe, plus any other service that introduces earth potential into the building (oil lines and structural steelwork can apply in some cases).<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fcebaff elementor-widget elementor-widget-heading\" data-id=\"fcebaff\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Location Of The Bond\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-039fe13 elementor-widget elementor-widget-text-editor\" data-id=\"039fe13\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Regulation 544.1.2 sets the location rule. The connection should be made as near as practicable to the point of entry, normally within 600mm of the meter outlet, on the consumer side, and before any branch or tee in the pipework. The exact wording in BS 7671 uses &#8220;where practicable,&#8221; which matters. If the meter cupboard geometry genuinely prevents a connection within 600mm, the closest practicable accessible point before the first branch is acceptable. The same 600mm guidance is mirrored in BS 6891:2015 clause 8.4.3.2 for gas installation pipework, and in<\/span><strong><a href=\"https:\/\/registeredgasengineer.co.uk\/technical\/technical-bulletin-102\/\"> Gas Safe Register Technical Bulletin 102<\/a><\/strong><span style=\"font-weight: 400;\">, which also recognises an external meter box termination as an acceptable alternative.<\/span><\/p><p><span style=\"font-weight: 400;\">What this means in practice:<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f18ca92 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"f18ca92\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Consumer side of the meter, not the inlet.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Before the first tee or branch.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">On hard metal pipework, not on a flexible connector.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Accessible for future inspection. Boxed-in or buried bonds will be flagged.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-971ba9f elementor-widget elementor-widget-heading\" data-id=\"971ba9f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Conductor Size\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-17cd06d elementor-widget elementor-widget-text-editor\" data-id=\"17cd06d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Regulation 544.1.1 governs sizing, and the rule splits by supply type.<\/span><\/p><p><span style=\"font-weight: 400;\">A 6mm\u00b2 bond on a PME installation will be coded. Do not undersize.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1ec0af2 elementor-widget elementor-widget-heading\" data-id=\"1ec0af2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Clamp Standard\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bcae345 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"bcae345\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Use a BS 951 earth clamp.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Fix to clean, bare metal. Paint, dirt, and corrosion all kill the connection.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Fit the \"Safety Electrical Connection - Do Not Remove\" label.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Keep it accessible.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bffaea5 elementor-widget elementor-widget-heading\" data-id=\"bffaea5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Continuity Test Values\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b60b3bb elementor-widget elementor-widget-text-editor\" data-id=\"b60b3bb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">BS 7671 does not set a maximum resistance for the main protective bonding conductor itself. What inspectors look for is a satisfactory continuity reading that reflects the length and CSA of the conductor. The often-quoted <\/span><b>0.05\u03a9 figure<\/b><span style=\"font-weight: 400;\"> relates to the joint at the clamp, taken from IET Guidance Note 3, and is the expected difference between the second test measurement (to the pipe) and the first measurement (to the clamp). It is not a hard limit on the overall conductor resistance, and the regulation does not impose one. <\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-18f5ffe e-flex e-con-boxed e-con e-parent\" data-id=\"18f5ffe\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f322e54 elementor-widget elementor-widget-heading\" data-id=\"f322e54\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Plastic Pipework: When Earth Bonding Is Not Required\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f82231b elementor-widget elementor-widget-text-editor\" data-id=\"f82231b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">This is where a lot of well-meaning work goes wrong. If the incoming gas or water service is plastic, the metallic pipework inside the property is not an extraneous-conductive-part. It cannot introduce earth potential from outside. Bonding it is not required and, in some cases, can actually create problems by exporting fault current along internal pipework.<\/span><\/p><p><span style=\"font-weight: 400;\">The same logic applies to:<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-be9292d elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"be9292d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Internal plumbing fed by a plastic rising main.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Stainless steel kitchen furniture.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Bathroom radiators on plastic pipe.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bb809ff elementor-widget elementor-widget-text-editor\" data-id=\"bb809ff\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">None of these are extraneous-conductive-parts by the BS 7671 definition. Bonding them is a habit, not a requirement.<\/span><\/p><p><span style=\"font-weight: 400;\">Where visual inspection cannot confirm what feeds a metallic part, a resistance measurement to the MET will settle it. The threshold derived from the formula in IET Guidance Note 8 determines whether the part introduces earth potential. If the measured resistance is above that threshold, the part is not extraneous and does not need bonding.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6beb4a3 e-flex e-con-boxed e-con e-parent\" data-id=\"6beb4a3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f06d7af elementor-widget elementor-widget-heading\" data-id=\"f06d7af\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Supplementary Bonding: The Bathroom Question\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8f1b44c elementor-widget elementor-widget-image\" data-id=\"8f1b44c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"825\" height=\"550\" src=\"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Plastic-Pipework-When-Earth-Bonding-Is-Not-Required.png\" class=\"attachment-large size-large wp-image-18878\" alt=\"Plastic Pipework When Earth Bonding Is Not Required\" srcset=\"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Plastic-Pipework-When-Earth-Bonding-Is-Not-Required.png 825w, https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Plastic-Pipework-When-Earth-Bonding-Is-Not-Required-300x200.png 300w, https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Plastic-Pipework-When-Earth-Bonding-Is-Not-Required-768x512.png 768w, https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Plastic-Pipework-When-Earth-Bonding-Is-Not-Required-18x12.png 18w, https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Plastic-Pipework-When-Earth-Bonding-Is-Not-Required-600x400.png 600w\" sizes=\"(max-width: 825px) 100vw, 825px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7cacb81 elementor-widget elementor-widget-text-editor\" data-id=\"7cacb81\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Supplementary bonding sits inside the special location rules in Section 701 of BS 7671. In older domestic installations, you would expect to see green and yellow conductors linking the bath, taps, radiator, and any other metal in the room together. In a modern installation, supplementary bonding can often be omitted, but only if every condition in Regulation 701.415.2 is met.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1a52ec8 elementor-widget elementor-widget-heading\" data-id=\"1a52ec8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">The Three Conditions For Omission\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-34179d0 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"34179d0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">All final circuits in the location comply with the automatic disconnection times in Regulation 411.3.2.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">All final circuits have additional protection by a 30mA RCD.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">All extraneous-conductive-parts in the location are effectively connected to the main protective bonding (i.e. main protective bonding to the incoming services has been correctly carried out).<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2b3e475 elementor-widget elementor-widget-text-editor\" data-id=\"2b3e475\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">If any one condition fails, supplementary bonding has to be installed. That last point catches people out. If the main bonding is undersized, missing, or on the wrong side of the meter, the bathroom cannot rely on the omission.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1c0632f elementor-widget elementor-widget-heading\" data-id=\"1c0632f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Sizing And Testing<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-79dd4e5 elementor-widget elementor-widget-text-editor\" data-id=\"79dd4e5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Supplementary bonding conductors are sized under Regulation 544.2. The practical minimum for most domestic work is 2.5mm\u00b2 copper with mechanical protection, or 4mm\u00b2 copper without. The test criterion is set in Regulation 415.2.2:<\/span><\/p><p><span style=\"font-weight: 400;\">R \u2264 50\/Ia<\/span><\/p><p><span style=\"font-weight: 400;\">Where R is the resistance between simultaneously accessible parts, 50 is the maximum acceptable touch voltage in volts, and Ia is the operating current of the protective device within the required disconnection time.<\/span><\/p><p><span style=\"font-weight: 400;\">For a 30mA RCD, that gives R \u2264 1,667\u03a9. For a 6A Type B MCB requiring 30A to operate within 5 seconds, R \u2264 1.67\u03a9. The figure depends entirely on what protects the circuit. <\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-9459344 e-flex e-con-boxed e-con e-parent\" data-id=\"9459344\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-46c8f70 elementor-widget elementor-widget-heading\" data-id=\"46c8f70\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Where Inspectors Look First During An EICR\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0304034 elementor-widget elementor-widget-text-editor\" data-id=\"0304034\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Walk into an EICR with an experienced inspector and you will see the same pattern every time. They head for the meter cupboard before they touch the consumer unit. Here is the running order, and why.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c0c9ca2 elementor-widget elementor-widget-heading\" data-id=\"c0c9ca2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">1. Gas Meter\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a354af3 elementor-widget elementor-widget-text-editor\" data-id=\"a354af3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">The inspector checks for a correctly sized conductor (typically 10mm\u00b2 on a domestic PME service) terminated on a BS 951 clamp, on the consumer side, within 600mm of the outlet where practicable, on clean metal, with the warning label fitted.<\/span><\/p><p><span style=\"font-weight: 400;\">Missing or inadequate main protective bonding on the gas service is one of the most consistently observed EICR failures across the UK private rented sector. It almost always attracts a <\/span><b>C2 code<\/b><span style=\"font-weight: 400;\"> (potentially dangerous, requiring urgent remedial work within 28 days).<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-78f3ee4 elementor-widget elementor-widget-heading\" data-id=\"78f3ee4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">2. Water Main\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d879b5f elementor-widget elementor-widget-text-editor\" data-id=\"d879b5f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Same checks at the stop-tap. The bond goes on the metallic incoming pipe within 600mm of the point of entry where practicable, before the first branch. Where the supply is plastic up to the stop-tap and then converts to copper, the inspector assesses whether the metal portion actually introduces earth potential. Usually it does not.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3f23a0b elementor-widget elementor-widget-heading\" data-id=\"3f23a0b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">3. Main Earthing Terminal\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6bc7f7f elementor-widget elementor-widget-text-editor\" data-id=\"6bc7f7f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">They will lift the MET cover and check:<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-43735f2 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"43735f2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Bonding conductors actually terminate at the MET.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">The earthing conductor is correctly sized for the supply type.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">The MET is identifiable and labelled.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Terminations are tight and free of corrosion.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-10eb1d5 elementor-widget elementor-widget-text-editor\" data-id=\"10eb1d5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Loose terminations, mixed conductor sizes, and undersized earthing conductors on PME supplies are common observations.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a91eded elementor-widget elementor-widget-heading\" data-id=\"a91eded\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">4. Supply Type Identification\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d50f492 elementor-widget elementor-widget-text-editor\" data-id=\"d50f492\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">TN-S, TN-C-S (PME), or TT. The supply type drives the bonding conductor size and dictates whether an earth electrode is needed. Getting the supply type wrong on the certificate is itself a quality issue. Amendment 3:2024 to BS 7671 now recommends an additional earth electrode for all TN systems under Regulation 411.4.2.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f6cac36 elementor-widget elementor-widget-heading\" data-id=\"f6cac36\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">5. Bathrooms\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-517e555 elementor-widget elementor-widget-text-editor\" data-id=\"517e555\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">If the installation pre-dates RCD protection or fails the conditions in 701.415.2, the inspector looks for supplementary bonding to the bath, taps, towel rail, and any radiator that meets the extraneous-conductive-part definition. Older installations frequently have it. Modern compliant installations often legitimately omit it.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8a0dad6 elementor-widget elementor-widget-heading\" data-id=\"8a0dad6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">6. Outbuildings, Sheds, Garages\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0cdaef9 elementor-widget elementor-widget-text-editor\" data-id=\"0cdaef9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Any sub-installation fed from the main building needs its own assessment. TT supplies often appear here, especially on outbuildings where PME has not been extended. <\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-18affef e-flex e-con-boxed e-con e-parent\" data-id=\"18affef\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-93afb4f elementor-widget elementor-widget-heading\" data-id=\"93afb4f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Common EICR Failures Worth Knowing\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d07f3b8 elementor-widget elementor-widget-image\" data-id=\"d07f3b8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"825\" height=\"550\" src=\"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Common-EICR-Failures-Worth-Knowing.png\" class=\"attachment-large size-large wp-image-18877\" alt=\"Common EICR Failures Worth Knowing\" srcset=\"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Common-EICR-Failures-Worth-Knowing.png 825w, https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Common-EICR-Failures-Worth-Knowing-300x200.png 300w, https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Common-EICR-Failures-Worth-Knowing-768x512.png 768w, https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Common-EICR-Failures-Worth-Knowing-18x12.png 18w, https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Common-EICR-Failures-Worth-Knowing-600x400.png 600w\" sizes=\"(max-width: 825px) 100vw, 825px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d0f31b1 elementor-widget elementor-widget-text-editor\" data-id=\"d0f31b1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">A short list of the failures that come up week after week:<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7cf248f elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"7cf248f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Main protective bonding conductor terminated outside the practicable 600mm window. Very common in retrofitted gas meters where the meter has been moved but the bond was left in place.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">6mm\u00b2 bonding conductor on a PME installation where 10mm\u00b2 or larger is required.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Clamp fitted to a painted or chromed pipe with no preparation, giving a high-resistance connection.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Missing BS 951 warning label.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Bonding conductor disconnected at the MET because someone \"tidied up\" the cupboard.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Bonding installed to plastic-fed internal pipework that does not require it, while the actual incoming metallic service goes unbonded.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Supplementary bonding omitted in a bathroom that does not satisfy 701.415.2 because the consumer unit has no 30mA RCD coverage on the relevant circuits.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Internal gas pipework altered during a boiler replacement or kitchen refit, leaving the bond on a section now isolated from the meter by a plastic insert.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6b44343 elementor-widget elementor-widget-text-editor\" data-id=\"6b44343\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Code allocation is the inspector&#8217;s call, but missing main bonding will almost always be C2 under current<\/span><strong><a href=\"https:\/\/professional-electrician.com\/technical\/the-requirements-of-bs-7671-for-protective-equipotential-bonding-where-ads-is-used-niceic\/\"> NICEIC guidance<\/a><\/strong><span style=\"font-weight: 400;\"> and the Electrical Safety First Best Practice Guide 4. For landlords under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, a C2 means an unsatisfactory report, 28 days to remediate, and potential local authority penalties of up to \u00a330,000 if ignored. <\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-faddeb3 e-flex e-con-boxed e-con e-parent\" data-id=\"faddeb3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3560295 elementor-widget elementor-widget-heading\" data-id=\"3560295\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">PME And The Open-PEN Risk\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ba752ef elementor-widget elementor-widget-text-editor\" data-id=\"ba752ef\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">One safety point worth stressing for trades new to this work. Under TN-C-S (PME) supplies, a broken supply neutral in the street can elevate all bonded metalwork inside the property towards live potential, because the building&#8217;s bonded mass becomes the alternative return path for neutral current.<\/span><\/p><p><span style=\"font-weight: 400;\">This is the reason PME installations require larger bonding conductors than TN-S systems (Table 54.8), and the reason loose, corroded, or undersized terminations are taken so seriously by inspectors. A bond that looks fine until a network fault occurs is not fine. Mechanical integrity of every clamp, lug, and terminal in the bonding system is the difference between a controlled fault and an exported potential. <\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-761eb42 e-flex e-con-boxed e-con e-parent\" data-id=\"761eb42\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8d3a6f0 elementor-widget elementor-widget-heading\" data-id=\"8d3a6f0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Testing The Bonding: Good Practice\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-99a1162 elementor-widget elementor-widget-text-editor\" data-id=\"99a1162\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Continuity testing of the main protective bonding is a long-lead test with the conductor disconnected from the MET. The expected reading is the resistance per metre of the conductor multiplied by the run length, plus a small allowance for the clamp joint.<\/span><\/p><p><span style=\"font-weight: 400;\">For 10mm\u00b2 copper at 20\u00b0C, the resistance is approximately 1.83m\u03a9 per metre. A 5-metre run should read around 9\u201310m\u03a9 at the conductor, plus the clamp contribution. If the reading is significantly higher than that calculation, something is wrong:<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-61e8286 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"61e8286\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Poor clamp connection.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Corrosion at a termination.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Damaged conductor.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Joint that was never tightened properly.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a73c2af elementor-widget elementor-widget-text-editor\" data-id=\"a73c2af\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">For supplementary bonding, the test is between simultaneously accessible parts and the protective conductor of the circuit. The result must satisfy R \u2264 50\/Ia for the relevant protective device.<\/span><\/p><p><span style=\"font-weight: 400;\">Tradesmen new to this work should sit with a copy of IET Guidance Note 3 (Inspection and Testing) on the bench and learn the procedure before they certify anything.<\/span><\/p><p><span style=\"font-weight: 400;\">Reconnect the conductor to the MET after every test. Forgetting that step is how installations leave site in a worse condition than they arrived.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-53f82d0 e-flex e-con-boxed e-con e-parent\" data-id=\"53f82d0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3c8184e elementor-widget elementor-widget-heading\" data-id=\"3c8184e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Why The Rules Exist\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1af7d89 elementor-widget elementor-widget-text-editor\" data-id=\"1af7d89\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Earth bonding is not paperwork. It is the single feature that prevents a person standing in a bathroom from becoming the conducting path between a faulty appliance and a metal pipe at earth potential.<\/span><\/p><p><span style=\"font-weight: 400;\">The 600mm guidance exists because the closer the bond sits to the point where the service enters the building, the more effective the equipotential zone. A bond placed three metres downstream leaves a length of incoming metal pipe outside the zone, which is exactly what the regulation is trying to avoid. Accessibility for inspection is a useful side benefit, not the primary reason.<\/span><\/p><p><span style=\"font-weight: 400;\">The conductor sizes are derived from fault current calculations under PME conditions, where a broken supply neutral can throw bonded metalwork up towards live potential. The whole framework is engineered for the worst-case fault, not for ordinary operation.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Keep your bonding checks sharp and your testing routine consistent. <\/span><strong><a href=\"https:\/\/learn.tradefoxapp.com\/\">TradeFox<\/a><\/strong><span style=\"font-weight: 400;\"> helps you build practical skills that carry into real jobs, with clear training you can work through at your own pace. <\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-4416894 e-flex e-con-boxed e-con e-parent\" data-id=\"4416894\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9efcc21 elementor-widget elementor-widget-heading\" data-id=\"9efcc21\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Keeping Current With The Regulations\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-65f8b9e elementor-widget elementor-widget-text-editor\" data-id=\"65f8b9e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">For tradesmen building their knowledge, the most useful documents outside BS 7671 itself are:<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-037ff18 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"037ff18\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">IET On-Site Guide for quick reference on standard domestic work.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">IET Guidance Note 3 for inspection and testing procedure.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">IET Guidance Note 8 for the detail on earthing and bonding, including the test method for determining whether a part is extraneous.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">NICEIC and NAPIT technical bulletins, which regularly clarify the trickier corners of 544.1.1 and 701.415.2.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-long-arrow-alt-right\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M313.941 216H12c-6.627 0-12 5.373-12 12v56c0 6.627 5.373 12 12 12h301.941v46.059c0 21.382 25.851 32.09 40.971 16.971l86.059-86.059c9.373-9.373 9.373-24.569 0-33.941l-86.059-86.059c-15.119-15.119-40.971-4.411-40.971 16.971V216z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Electrical Safety First Best Practice Guide 4 for EICR coding.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7ea9d06 elementor-widget elementor-widget-text-editor\" data-id=\"7ea9d06\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">The regulations evolve. Amendment 3 (2024) brought changes to TN earth electrode recommendations, and Amendment 4 (currently in draft for 2026) introduces a new Section 545 on functional earthing for ICT and renewable installations. The difference between a satisfactory EICR and an unsatisfactory one is often whether the person doing the work has kept current with the wording of 411.3.1.2, 544.1.2, and 701.415.2. Bonding done properly is invisible. That is the point. <\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Earth bonding is one of those topics that sounds straightforward on paper and then catches half the trade out when it comes to inspection day. Inspectors fail installations every week over it. Not because the work is hard, but because the rules are misunderstood, the testing is skipped, or someone bonded a sink that never [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18879,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_glsr_average":0,"_glsr_ranking":0,"_glsr_reviews":0,"footnotes":""},"categories":[1],"tags":[1199,1188,1186,272,1190,1197,1198,1182,1187,1184,1189,1192,1183,1191,1196,1185,575,1194,1195,1193],"class_list":["post-18945","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical","tag-amendment-3","tag-bathroom-bonding","tag-bonding-conductor","tag-bs-7671","tag-bs-951","tag-c2-code","tag-continuity-test","tag-earth-bonding","tag-earthing-conductor","tag-eicr-failures","tag-extraneous-parts","tag-gas-bonding","tag-main-bonding","tag-main-earthing","tag-open-pen","tag-pme-supply","tag-supplementary-bonding","tag-tn-c-s","tag-tn-s","tag-water-bonding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First<\/title>\n<meta name=\"description\" content=\"Earth Bonding In UK Homes explained with main vs supplementary bonding, inspector checks, EICR faults and common installation mistakes to avoid on site.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tradefoxapp.com\/fr\/earth-bonding\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First\" \/>\n<meta property=\"og:description\" content=\"Earth Bonding In UK Homes explained with main vs supplementary bonding, inspector checks, EICR faults and common installation mistakes to avoid on site.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tradefoxapp.com\/fr\/earth-bonding\/\" \/>\n<meta property=\"og:site_name\" content=\"Tradefox | Construction Training Online\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=61561067514381\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-05T08:17:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-05T08:20:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png\" \/>\n\t<meta property=\"og:image:width\" content=\"825\" \/>\n\t<meta property=\"og:image:height\" content=\"550\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Tradefoxapp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Tradefox_app\" \/>\n<meta name=\"twitter:site\" content=\"@Tradefox_app\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tradefoxapp\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/\"},\"author\":{\"name\":\"Tradefoxapp\",\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/#\\\/schema\\\/person\\\/cad3ebca9b0c18ad17cdf9222b9e4d06\"},\"headline\":\"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First\",\"datePublished\":\"2026-06-05T08:17:34+00:00\",\"dateModified\":\"2026-06-05T08:20:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/\"},\"wordCount\":2267,\"publisher\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tradefoxapp.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png\",\"keywords\":[\"Amendment 3\",\"bathroom bonding\",\"bonding conductor\",\"bs 7671\",\"BS 951\",\"C2 code\",\"continuity test\",\"earth bonding\",\"earthing conductor\",\"EICR failures\",\"extraneous parts\",\"gas bonding\",\"main bonding\",\"main earthing\",\"open PEN\",\"PME supply\",\"supplementary bonding\",\"TN-C-S\",\"TN-S\",\"water bonding\"],\"articleSection\":[\"Electrical\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/\",\"url\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/\",\"name\":\"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tradefoxapp.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png\",\"datePublished\":\"2026-06-05T08:17:34+00:00\",\"dateModified\":\"2026-06-05T08:20:31+00:00\",\"description\":\"Earth Bonding In UK Homes explained with main vs supplementary bonding, inspector checks, EICR faults and common installation mistakes to avoid on site.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tradefoxapp.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png\",\"contentUrl\":\"https:\\\/\\\/tradefoxapp.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png\",\"width\":825,\"height\":550,\"caption\":\"Main Bonding vs Supplementary, Where Inspectors Look First\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/earth-bonding\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tradefoxapp.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/#website\",\"url\":\"https:\\\/\\\/tradefoxapp.com\\\/\",\"name\":\"Tradefox | Construction Training Online\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tradefoxapp.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/#organization\",\"name\":\"Tradefox | Construction Training Online\",\"url\":\"https:\\\/\\\/tradefoxapp.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/tradefoxapp.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/logo-transperent.png\",\"contentUrl\":\"https:\\\/\\\/tradefoxapp.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/logo-transperent.png\",\"width\":1024,\"height\":208,\"caption\":\"Tradefox | Construction Training Online\"},\"image\":{\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=61561067514381\",\"https:\\\/\\\/x.com\\\/Tradefox_app\",\"https:\\\/\\\/www.instagram.com\\\/tradefoxapp\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/tradefox-ltd\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tradefoxapp.com\\\/#\\\/schema\\\/person\\\/cad3ebca9b0c18ad17cdf9222b9e4d06\",\"name\":\"Tradefoxapp\",\"sameAs\":[\"https:\\\/\\\/tradefoxapp.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First","description":"Earth Bonding In UK Homes explained with main vs supplementary bonding, inspector checks, EICR faults and common installation mistakes to avoid on site.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tradefoxapp.com\/fr\/earth-bonding\/","og_locale":"fr_FR","og_type":"article","og_title":"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First","og_description":"Earth Bonding In UK Homes explained with main vs supplementary bonding, inspector checks, EICR faults and common installation mistakes to avoid on site.","og_url":"https:\/\/tradefoxapp.com\/fr\/earth-bonding\/","og_site_name":"Tradefox | Construction Training Online","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=61561067514381","article_published_time":"2026-06-05T08:17:34+00:00","article_modified_time":"2026-06-05T08:20:31+00:00","og_image":[{"width":825,"height":550,"url":"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png","type":"image\/png"}],"author":"Tradefoxapp","twitter_card":"summary_large_image","twitter_creator":"@Tradefox_app","twitter_site":"@Tradefox_app","twitter_misc":{"\u00c9crit par":"Tradefoxapp","Dur\u00e9e de lecture estim\u00e9e":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tradefoxapp.com\/earth-bonding\/#article","isPartOf":{"@id":"https:\/\/tradefoxapp.com\/earth-bonding\/"},"author":{"name":"Tradefoxapp","@id":"https:\/\/tradefoxapp.com\/#\/schema\/person\/cad3ebca9b0c18ad17cdf9222b9e4d06"},"headline":"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First","datePublished":"2026-06-05T08:17:34+00:00","dateModified":"2026-06-05T08:20:31+00:00","mainEntityOfPage":{"@id":"https:\/\/tradefoxapp.com\/earth-bonding\/"},"wordCount":2267,"publisher":{"@id":"https:\/\/tradefoxapp.com\/#organization"},"image":{"@id":"https:\/\/tradefoxapp.com\/earth-bonding\/#primaryimage"},"thumbnailUrl":"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png","keywords":["Amendment 3","bathroom bonding","bonding conductor","bs 7671","BS 951","C2 code","continuity test","earth bonding","earthing conductor","EICR failures","extraneous parts","gas bonding","main bonding","main earthing","open PEN","PME supply","supplementary bonding","TN-C-S","TN-S","water bonding"],"articleSection":["Electrical"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/tradefoxapp.com\/earth-bonding\/","url":"https:\/\/tradefoxapp.com\/earth-bonding\/","name":"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First","isPartOf":{"@id":"https:\/\/tradefoxapp.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tradefoxapp.com\/earth-bonding\/#primaryimage"},"image":{"@id":"https:\/\/tradefoxapp.com\/earth-bonding\/#primaryimage"},"thumbnailUrl":"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png","datePublished":"2026-06-05T08:17:34+00:00","dateModified":"2026-06-05T08:20:31+00:00","description":"Earth Bonding In UK Homes explained with main vs supplementary bonding, inspector checks, EICR faults and common installation mistakes to avoid on site.","breadcrumb":{"@id":"https:\/\/tradefoxapp.com\/earth-bonding\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tradefoxapp.com\/earth-bonding\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/tradefoxapp.com\/earth-bonding\/#primaryimage","url":"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png","contentUrl":"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/06\/Main-Bonding-vs-Supplementary-Where-Inspectors-Look-First.png","width":825,"height":550,"caption":"Main Bonding vs Supplementary, Where Inspectors Look First"},{"@type":"BreadcrumbList","@id":"https:\/\/tradefoxapp.com\/earth-bonding\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tradefoxapp.com\/"},{"@type":"ListItem","position":2,"name":"Earth Bonding In UK Homes: Main Bonding vs Supplementary, Where Inspectors Look First"}]},{"@type":"WebSite","@id":"https:\/\/tradefoxapp.com\/#website","url":"https:\/\/tradefoxapp.com\/","name":"Tradefox | Formation en construction en ligne","description":"","publisher":{"@id":"https:\/\/tradefoxapp.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tradefoxapp.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/tradefoxapp.com\/#organization","name":"Tradefox | Formation en construction en ligne","url":"https:\/\/tradefoxapp.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/tradefoxapp.com\/#\/schema\/logo\/image\/","url":"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/03\/logo-transperent.png","contentUrl":"https:\/\/tradefoxapp.com\/wp-content\/uploads\/2026\/03\/logo-transperent.png","width":1024,"height":208,"caption":"Tradefox | Construction Training Online"},"image":{"@id":"https:\/\/tradefoxapp.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=61561067514381","https:\/\/x.com\/Tradefox_app","https:\/\/www.instagram.com\/tradefoxapp\/","https:\/\/www.linkedin.com\/company\/tradefox-ltd\/"]},{"@type":"Person","@id":"https:\/\/tradefoxapp.com\/#\/schema\/person\/cad3ebca9b0c18ad17cdf9222b9e4d06","name":"Tradefoxapp","sameAs":["https:\/\/tradefoxapp.com"]}]}},"_links":{"self":[{"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/posts\/18945","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/comments?post=18945"}],"version-history":[{"count":35,"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/posts\/18945\/revisions"}],"predecessor-version":[{"id":19039,"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/posts\/18945\/revisions\/19039"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/media\/18879"}],"wp:attachment":[{"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/media?parent=18945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/categories?post=18945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tradefoxapp.com\/fr\/wp-json\/wp\/v2\/tags?post=18945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}